首页> 外文会议>Engineers' Society of Western Pennsylvania;Annual International Bridge Conference >DESIGN AND CONSTRUCTION OF ST. PATRICK'S PEDESTRIAN BRIDGE IN CALGARY
【24h】

DESIGN AND CONSTRUCTION OF ST. PATRICK'S PEDESTRIAN BRIDGE IN CALGARY

机译:ST的设计与施工帕特里克在卡尔加里的步行桥

获取原文

摘要

St. Patrick’s Bridge crossing the Bow River in Calgary is currently under construction and will be reachingcompletion at the time of the conference. The bridge is the result of an open international competition wonby a joint venture between RFR architects and engineers, and Halsall, now part of the Parsons Brinckerhoffgroup.The footbridge is a three-span, 182 metre long network arch structure spanning over the Bow River at thetip of St. Patrick’s Island in Calgary. The inherently efficient scheme with generous span to depth ratios wasoptimized parametrically with respect to member geometry and sizes. The slender arches and slim deckhave minimal contact with the river banks thereby responding to the openness and the natural qualities ofthe site.Several challenges were encountered during the course of the construction, the most significant of whichwas the unprecedented flooding of June 2013 that washed out critical deck falsework, and caused extensivedamage to the bridge deck and steelwork. Finally, the design itself presented certain constructionchallenges such as the sequencing of installation operations and hanger cable tensioning so that the archesand deck work together as a network arch.
机译:穿越卡尔加里弓河的圣帕特里克桥目前正在建设中,并将到达 会议时完成。这座桥是国际公开比赛获胜的结果 由RFR建筑师和工程师与Halsall(现为Parsons Brinckerhoff的子公司)组成的合资企业 团体。 行人天桥是一个三跨,长182米的网络拱形结构,横跨拱门河的弓河。 卡尔加里圣帕特里克岛的尽头。具有宽广的跨度比的固有高效方案是 在成员几何形状和尺寸方面进行参数优化。纤细的拱门和纤薄的甲板 与河岸的接触极少,因此对河岸的开放性和自然特质做出了回应 网站。 在施工过程中遇到了几个挑战,其中最大的挑战是 是2013年6月前所未有的洪水,冲刷了严重的甲板虚假作业,并造成了 损坏桥面和钢结构。最后,设计本身呈现出一定的构造 挑战,例如安装操作的顺序和吊架电缆的张紧,以至于拱形 和Deck作为网络拱门一起工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号