首页> 外国专利> DESIGN AND CONSTRUCTION METHOD OF BICYCLE-PEDESTRIAN BRIDGE USING PRESTRESSED COLUMN CONNECTING PART AND READY-MADE H-BEAM

DESIGN AND CONSTRUCTION METHOD OF BICYCLE-PEDESTRIAN BRIDGE USING PRESTRESSED COLUMN CONNECTING PART AND READY-MADE H-BEAM

机译:预应力柱连接件与现成H型梁的双行人桥梁设计与施工方法

摘要

The present invention relates to a construction method of a bicycle-pedestrian bridge where bicycles and persons use. The present invention suggests a method for connecting a column part to a coping by fitting a circular pipe to the top of the column part to facilitate construction while bearing a load applied to the bicycle-pedestrian bridge and suggests a method for completing the bridge by manufacturing the coping using a material having easy availability. Thus, the present invention improves the appearance of the bridge as bolts and nuts for connecting the column to the coping do not exist in the outer side of the column and simplifies the construction of the bridge.;COPYRIGHT KIPO 2016
机译:自行车人行道的建造方法技术领域本发明涉及自行车和人使用的自行车人行道的建造方法。本发明提出了一种通过将圆形管装配到立柱部分的顶部来将立柱部分连接到顶盖的方法,以便于在承受施加到自行车人行天桥的载荷的同时便于建造,并且提出了一种通过制造来完成桥梁的方法。使用容易获得的材料应对。因此,本发明改善了桥的外观,因为在柱的外侧不存在用于将柱连接到顶盖的螺栓和螺母,并且简化了桥的构造。; COPYRIGHT KIPO 2016

著录项

  • 公开/公告号KR20160026213A

    专利类型

  • 公开/公告日2016-03-09

    原文格式PDF

  • 申请/专利权人 CHEONG WON ENGINEERING CO. LTD.;

    申请/专利号KR20140114310

  • 发明设计人 MOON BYEONG OKKR;

    申请日2014-08-29

  • 分类号E01D21/00;E01D19/02;

  • 国家 KR

  • 入库时间 2022-08-21 14:14:56

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号