首页> 外文会议>International Conference on Service Systems and Service Management >Project management on the establishment of raw material procurement system for biomass power plant
【24h】

Project management on the establishment of raw material procurement system for biomass power plant

机译:建立生物质电厂原料采购系统的项目管理

获取原文

摘要

With the drawbacks of traditionally power generation becoming increasingly prominent, production of electricity from new energy attracts more and more attention instead. Biomass power, as a sort of new energy generation, typically of lower carbon and better environmental protection, has a significant potential for development. Based on PMBOK's five process groups, this paper mainly discussed the construction of material procurement system, and the involved issues arousing high attention. Implemented by the material procurement system at biomass power plant, the applications in project management are expanded.
机译:随着传统上发电的弊端变得越来越突出,由新能源生产的电力反而引起了越来越多的关注。生物质能作为一种新能源,通常具有较低的碳含量和更好的环境保护,具有巨大的发展潜力。本文在PMBOK的五个流程组的基础上,主要讨论了物料采购系统的构建以及所引起的高度关注的问题。通过生物质发电厂的物料采购系统,项目管理中的应用得以扩展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号