首页> 外文会议>International Conference on Service Systems and Service Management >Project management on the establishment of raw material procurement system for biomass power plant
【24h】

Project management on the establishment of raw material procurement system for biomass power plant

机译:生物质发电厂原料采购系统建立项目管理

获取原文

摘要

With the drawbacks of traditionally power generation becoming increasingly prominent, production of electricity from new energy attracts more and more attention instead. Biomass power, as a sort of new energy generation, typically of lower carbon and better environmental protection, has a significant potential for development. Based on PMBOK's five process groups, this paper mainly discussed the construction of material procurement system, and the involved issues arousing high attention. Implemented by the material procurement system at biomass power plant, the applications in project management are expanded.
机译:随着传统发电的缺点变得越来越突出,新能源的电力生产越来越多的关注。作为一种新的能量发电,通常具有较低的碳和更好的环保,具有重要的发展潜力。基于PMBOK的五个流程组,本文主要讨论了材料采购系统的构建,以及涉及高度关注的杂志。由生物量电厂的材料采购系统实施,项目管理中的应用正在扩大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号