首页> 外文期刊>International journal of operations and quantitative management >A Decision Support System For Raw Materials procurement And Finished Goods Supply Logistics Of Arncoastal Integrated Steel Plant
【24h】

A Decision Support System For Raw Materials procurement And Finished Goods Supply Logistics Of Arncoastal Integrated Steel Plant

机译:Arnastastal Integrated Steel Plant原材料采购和成品供应物流的决策支持系统

获取原文
获取原文并翻译 | 示例
           

摘要

This paper deals with the development and implementation of a Decision Support System (DSS) for inbound raw materials logistics and 'back-to-back' supply of finished goods for a new coastal integrated steel plant. The problem under Study is a hierarchical in nature with strategic/design, tactical and operational planning dimensions. The logistics decision problem of the steel plant under consideration has such sub-problems as selection of suppliers, quantities to be brought from each supplier in each period, selection of optimal vessel size, ship schedule evaluation, selection and scheduling of barge mix, the schedules for lightering of raw materials to barges, and dispatch schedule of Hot Rolled Coils loaded barges for loading into ships. We have used a composite modeling approach for solving the problem. We have developed various models. These model have been properly integrated with necessary databases and developed a DSS for the logistics problems of this study. The DSS is used by the company for the procurement of raw materials and back-to-back integrated supply of finished goods.
机译:本文探讨了决策支持系统(DSS)的开发和实施,该决策支持系统用于新的沿海综合钢铁厂的入库原材料物流和成品的“背靠背”供应。研究中的问题本质上是分层的,具有战略/设计,战术和运营计划方面。所考虑的钢铁厂的物流决策问题具有以下子问题:选择供应商,每个时期要从每个供应商带来的数量,选择最佳船舶尺寸,评估船期,评估和安排驳船混合物,日程来减轻驳船的原材料负担,并安排热轧卷装载驳船的调度时间表,以便装船。我们使用了一种复合建模方法来解决该问题。我们开发了各种模型。这些模型已与必要的数据库正确集成,并针对本研究的物流问题开发了DSS。该公司将DSS用于原材料的采购和成品的背对背集成供应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号