首页> 外文会议>International pipeline conference >DEVELOPMENT AND PRIORITIZATION PORTFOLIO OF NATURAL-GAS COMPRESSION-STATION PROJECTS
【24h】

DEVELOPMENT AND PRIORITIZATION PORTFOLIO OF NATURAL-GAS COMPRESSION-STATION PROJECTS

机译:天然气压缩站项目的开发与优先项目组合

获取原文

摘要

The Compression Stations constructions were finished between 2009 and 2011 by PETROBRAS Engineering Department. TRANSPETRO had taken part in the whole design process, and is now responsible for the operation and maintenance of these stations, which were delivered with some items pending categorized as improvements. The principle objective of this study is to choose and adapt a method, based on portfolio management methodology, to undertake a portfolio of Natural-Gas Compression-Station projects with decision making supported by standardized criteria and developed scenarios, so that the needs of the company are satisfied with a good cost/benefit relationship. The Analytic Hierarchy Process was the method chosen for prioritization and selection of projects to be undertaken from the portfolio. The necessity to adapt this method to insert new projects throughout the year into the current portfolio was identified in order to attend the operational and maintenance demands.
机译:压缩站的建设由PETROBRAS工程部于2009年至2011年完成。 TRANSPETRO参与了整个设计过程,现在负责这些站点的运行和维护,并交付了一些待分类为改进的项目。这项研究的主要目的是基于组合管理方法来选择和调整一种方法,以自然气压缩站项目的组合来进行组合,并以标准化的标准和已开发的方案作为决策依据,从而满足公司的需求对良好的成本/收益关系感到满意。层次分析法是用于确定优先级和从项目组合中选择项目的方法。为了满足运营和维护需求,已经确定了采用这种方法将全年中的新项目插入当前投资组合的必要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号