Tunnels in soft ground for German high speed railway line Cologne-Frankfurt

机译:德国高速铁路线科隆 - 法兰克福的软土隧道

获取原文

摘要

The new line Cologne-Frankfurt is the centerpiece of the German and the future European high-speed traffic network and links important national and international long-distance lines (Figure 1). With a planned maximum speed of 300 km/h and seven stops time for travelling will be reduced significantly. At the 184 km long new line a total of 18 bridges (total length = 6 km) and 30 tunnels (total length = 47 km) will be constructed. This report is about two particular tunnel projects (Wandersmann-Tunnel and Schulwald-Tunnel) which are being excavated under difficult rock and groundwater conditions. Due to several extraordinary geotechnical conditions such as underpassing a higway with a cover of about 15-20 in NATM and driving through a landslide area by means of a large diameter shield machine, the drivings are accompanied by an intensive geotechnical monitoring programme.
机译:新线科隆 - 法兰克福是德国人和未来欧洲高速交通网络的核心,并将重要的国家和国际长途线路连接(图1)。规划的最大速度为300公里/小时,七个停止行驶时间将显着减少。在184公里的长线上,共有18个桥梁(总长度= 6公里)和30个隧道(总长度= 47 km)。本报告大约是两个特定的隧道项目(Wandersmann-Tunnel和Schulwald-Tunnel),该项目正在困难的岩石和地下水条件下被挖掘出来。由于若干非凡的岩土工程,例如在Natm中通过盖子的覆盖率地下通道,并且通过大直径屏蔽机通过滑坡区域驱动,驱动器伴随着强化岩土监测程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号