Forensic Schedule Analysis on Risk Adjusted Schedules

机译:风险调整时间表的法证时间表分析

获取原文

摘要

With increasing time and cost pressure from owners, it is likely that risk-adjustedschedules will expand beyond their current uses and become more common in buildings andinfrastructure construction. Risk-adjusted CPM schedules use computer modeling to analyzethe likely fluctuation of activity durations resulting from a range of uncertainties and risks, andthen analyze the effects of the variations on the schedules float as different chains of activitiesare given different durations and the amount of float changes. The result is a schedule that hasa series of potential critical paths with varying degrees of likelihood, rather than a single CriticalPath and sub-critical paths. Forensic schedule analysis, however, is predicated on identifyingthe “single” contemporaneous critical path, often defined as the path with zero float. So whathappens when the CPM schedule series has been risk-adjusted so that float is variable andmore activities paths are critical? This paper will discuss a theoretical model for performing adelay analysis on a project where the initial baseline and all updates were adjusted for risk.
机译:随着业主时间和成本压力的增加,风险调整后 进度表将扩展到目前的用途之外,并在建筑物和建筑中变得越来越普遍 基础设施建设。风险调整后的每千次展示费用计划使用计算机建模进行分析 一系列不确定性和风险可能导致活动持续时间出现波动,以及 然后分析变化对时间表的影响,因为不同的活动链 给出了不同的持续时间和浮动量的变化。结果是一个时间表,其中包含 一系列具有不同程度可能性的潜在关键路径,而不是单个关键路径 路径和次关键路径。然而,取证程序分析是基于确定 “单一”同期关键路径,通常定义为浮动为零的路径。所以呢 在对CPM时间表系列进行风险调整,从而使浮动汇率可变且 更多的活动路径至关重要吗?本文将讨论一个理论模型来执行 在对初始基准和所有更新均已针对风险进行调整的项目上进行延迟分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号