首页> 外文会议>INMM annual meeting >Complexity in Developing an Integrated Plan for the Department of Energy Management of Nuclear Materials
【24h】

Complexity in Developing an Integrated Plan for the Department of Energy Management of Nuclear Materials

机译:核材料能源管理司制定综合计划的复杂性

获取原文

摘要

The Department of Energy (DOE or Department) has developed a process to build integratedplans to identify programmatic uses for nuclear materials, as well as plans for the consolidationand disposition of excess nuclear materials. Because of the varied program missions within theDOE (including material users and material disposers) developing integrated plans is extremelychallenging, but necessary to manage limited resources and ensure accomplishment of keyobjectives. DOE is comprised of multiple program offices, sometimes with competingobjectives, that have responsibility for management and control of their nuclear material. TheOffice of Nuclear Materials Integration (ONMI) coordinates with these program offices to ensurenuclear materials are available to meet the highest priority requirements, facilitating transfer ofmaterial ownership as necessary to meet programmatic objectives and to dispose of materialsthat are no longer needed to meet Departmental missions. The ONMI collects nuclear materialinformation from approximately forty DOE sites through the annual Nuclear Materials InventoryAssessment (NMIA) process. This paper describes how the NMIA information is supplementedby other plans and schedules, as appropriate, to build plans for forecasting nuclear materialinventories, transfers, and disposition activities. This paper also illustrates how the ONMI isovercoming these complex challenges as they fulfill their responsibility to develop andimplement a comprehensive, integrated plan for all accountable nuclear materials.
机译:能源部(DOE或能源部)已经制定了建立一体化流程的程序。 确定核材料计划用途的计划,以及合并计划 和处置多余的核材料。由于内部的计划任务多种多样 能源部(包括材料使用者和材料处置者)制定综合计划非常 具有挑战性,但对于管理有限的资源并确保完成关键任务是必需的 目标。 DOE由多个计划办公室组成,有时会相互竞争 负责管理和控制其核材料的目标。这 核材料整合办公室(ONMI)与这些计划办公室进行协调,以确保 可提供满足最高优先要求的核材料,以促进核材料的转让。 满足计划目标和处置材料所必需的材料所有权 不再需要执行部门任务。 ONMI收集核材料 通过年度核材料清单从大约40个DOE站点获得的信息 评估(NMIA)流程。本文介绍了如何补充NMIA信息 根据其他计划和时间表,以建立预测核材料的计划 库存,转移和处置活动。本文还说明了ONMI是如何 克服这些复杂的挑战,因为它们履行了发展和创新的责任 对所有负责任的核材料实施全面的综合计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号