首页> 外文会议>North American Power Symposium >Decreasing the ice storm risk on power conductors by sequential outages
【24h】

Decreasing the ice storm risk on power conductors by sequential outages

机译:通过顺序中断降低电力导体上的冰风暴风险

获取原文

摘要

A tracing method is proposed in this paper to identify lines for outage for ice accumulation prevention on overhead lines during storms. The objective is to increase current flow on at-risk line by sequential outages of other lines in the network. The higher current flow causes more resistive power loss on line which increases temperature on the surface of the conductor. The outages are applied to the system sequentially in a priority order based on the sensitivity of line flow on the at-risk line to the outage of other lines. The procedure is stopped in case of non-convergence of power flow. All of the tracing procedures including power flow and contingency selection are calculated offline to achieve the most proper sequences. A 23-bus system has been used to evaluate performance of the method. All the calculation are done in PSSE software.
机译:本文提出了一种追踪方法,以识别风暴期间架空线上冰积累预防的中断线条。目的是通过网络中的其他线路在线中断来提高风险线上的电流。较高电流的流程导致线路上的电阻电力损耗更高,这增加了导体表面上的温度。基于线流量对境内流线的敏感性来顺序地以优先顺序应用于系统的停电。在电力流非收敛的情况下停止该程序。包括电流和应变选择的所有追踪程序都是计算离线以实现最适当的序列。 23总线系统已用于评估该方法的性能。所有计算都在PSSE软件中完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号