首页> 外文会议>North American Power Symposium >Decreasing the ice storm risk on power conductors by sequential outages
【24h】

Decreasing the ice storm risk on power conductors by sequential outages

机译:通过顺序停运来减少导线上的冰暴风险

获取原文

摘要

A tracing method is proposed in this paper to identify lines for outage for ice accumulation prevention on overhead lines during storms. The objective is to increase current flow on at-risk line by sequential outages of other lines in the network. The higher current flow causes more resistive power loss on line which increases temperature on the surface of the conductor. The outages are applied to the system sequentially in a priority order based on the sensitivity of line flow on the at-risk line to the outage of other lines. The procedure is stopped in case of non-convergence of power flow. All of the tracing procedures including power flow and contingency selection are calculated offline to achieve the most proper sequences. A 23-bus system has been used to evaluate performance of the method. All the calculation are done in PSSE software.
机译:本文提出了一种跟踪方法,用于识别暴雨中停电的线路,以防止架空线路上的冰块积聚。目的是通过网络中其他线路的连续中断来增加高风险线路上的电流。较高的电流流动会导致线路上的电阻功率损耗更大,从而增加导体表面的温度。根据高风险线路上的线路流对其他线路的中断的敏感性,将中断按优先级顺序依次应用于系统。如果功率流不收敛,则停止该过程。所有跟踪过程(包括潮流和应急选择)都是离线计算的,以实现最适当的顺序。 23总线系统已用于评估该方法的性能。所有计算均在PSSE软件中完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号