A new method to solve project scheduling problems with multi-skilled workforce constraints

机译:一种解决多熟劳动力约束项目调度问题的新方法

获取原文

摘要

With the developing of technology and economic of society, skilled workforce has been playing as the key role through the trend of prosperity. Project scheduling problems with multi-skilled workforce constraints (PSPMSWC) have become a research hotpot in the field of human resource allocation and project scheduling. Following the description and model of the PSPMSWC, a hybrid Benders decomposition (HBD) algorithm is presented in detail as well as the scheme of total solving process with heuristic inferring. After the programming and solving operation, results are gathered and analyzed afterward with conclusion at last.
机译:随着社会技术和经济的发展,通过繁荣的趋势,熟练的劳动力一直在发挥作用。项目调度问题与多熟劳动力约束(PSPMSWC)已成为人力资源配置和项目调度领域的研究热点。在PSPMSWC的描述和模型之后,详细介绍了混合弯曲器分解(HBD)算法,以及启发式推断的总求解过程的方案。在编程和解决操作之后,结果在后面收集和分析,最后。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号