DEALING WITH PRICE FLUCTUATIONS IN DREDGING CONTRACTS

机译:减少合同中的价格波动

获取原文

摘要

Escalation clauses are becoming increasingly common in dredging contracts as a means to deal with unexpected price rises resulting from fluctuations in the cost of raw materials, fuel and labour during the course of the construction project. The fundamentals causing price fluctuations for fuel, labour and raw material (mainly steel) are distinctively different. In order to have a transparent escalation mechanism, independent data sources are preferred. However, this requirement is not always possible. A client should decide during preparation of a tender whether an escalation clause is to be included to deal with price fluctuations of fuel, labour and raw materials. For dredging contracts with short duration it is recommended to have an escalation mechanism for fuel and for contracts with duration over 2 years an escalation of fuel, steel and labour is recommended. The main benefit of a balanced escalation provision in the contract is that it will take speculation out of the pricing of the work by the contractor, which will result in a better focus on the most favourable tender price for the project. As part of its tender estimate a contractor will calculate the costs of fuel, steel and wages, and has to evaluate the appropriateness of the escalation clause as provided by the client to cover the risk of price fluctuations during the execution period of the contract. The present paper describes the application of escalation clauses in general, with practical solutions for common issues, and discusses the decisions a client or contractor may wish to consider during the preparation of an escalation clause for an actual dredging contract.
机译:升级条款在疏contracts合同中变得越来越普遍,这是处理建设项目过程中原材料,燃料和人工成本波动导致价格意外上涨的一种手段。导致燃料,劳动力和原材料(主要是钢铁)价格波动的基本面明显不同。为了具有透明的升级机制,最好使用独立的数据源。但是,此要求并非始终可行。客户应在招标准备过程中决定是否包括升级条款以应对燃料,人工和原材料的价格波动。对于期限短的疏contracts合同,建议采用燃料上报机制,对于期限超过2年的合同,建议上调燃料,钢铁和人工。合同中均衡升级的规定的主要好处是,它将排除承包商的工作定价,从而将投机活动集中在最有利于该项目的投标价格上。作为其投标估算的一部分,承包商将计算燃料,钢材和工资的成本,并必须评估客户提供的升级条款的适用性,以涵盖合同执行期间价格波动的风险。本文介绍了升级条款的一般应用,并针对常见问题提供了实用的解决方案,并讨论了客户或承包商在准备实际挖泥船合同的升级条款时可能希望考虑的决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号