DEALING WITH PRICE FLUCTUATIONS IN DREDGING CONTRACTS

机译:处理疏浚合同中的价格波动

获取原文

摘要

Escalation clauses are becoming increasingly common in dredging contracts as a means to deal with unexpected price rises resulting from fluctuations in the cost of raw materials, fuel and labour during the course of the construction project. The fundamentals causing price fluctuations for fuel, labour and raw material (mainly steel) are distinctively different. In order to have a transparent escalation mechanism, independent data sources are preferred. However, this requirement is not always possible. A client should decide during preparation of a tender whether an escalation clause is to be included to deal with price fluctuations of fuel, labour and raw materials. For dredging contracts with short duration it is recommended to have an escalation mechanism for fuel and for contracts with duration over 2 years an escalation of fuel, steel and labour is recommended. The main benefit of a balanced escalation provision in the contract is that it will take speculation out of the pricing of the work by the contractor, which will result in a better focus on the most favourable tender price for the project. As part of its tender estimate a contractor will calculate the costs of fuel, steel and wages, and has to evaluate the appropriateness of the escalation clause as provided by the client to cover the risk of price fluctuations during the execution period of the contract. The present paper describes the application of escalation clauses in general, with practical solutions for common issues, and discusses the decisions a client or contractor may wish to consider during the preparation of an escalation clause for an actual dredging contract.
机译:升级条款在疏浚合同中越来越常见,作为处理意外价格上涨的手段,这些手段由于在建设项目过程中原材料,燃料和劳动力成本的波动而导致的意外价格上升。导致燃料价格波动的基本面,劳动力和原料(主要是钢铁)鲜明不同。为了具有透明的升级机制,独立的数据源是优选的。但是,这一要求并不总是可能。客户应在编制招标期间决定是否会纳入升级条款以处理燃料,劳动和原材料的价格波动。对于持续时间短的疏浚合同,建议燃料的升级机制,并且建议燃料,钢铁和劳动力超过2年的持续合同。合同中均衡升级规定的主要好处是,承包商的工作定价将拨出猜测,这将更好地关注项目最有利的投标价格。作为其招标估计的一部分,承包商将计算燃料,钢铁和工资的成本,并且必须评估客户提供的升级条款的适当性,以涵盖合同执行期间价格波动的风险。本论文介绍了升级条款的适用一般,与常见问题的切实可行的解决方案,并讨论客户或承包商不妨准备升级条款的实际疏浚合同时要考虑的决定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号