Train rescheduling for minimizing passenger travel time under disruption for metro lines

机译:火车重新安排,以最大限度地减少地铁线中断下的乘客旅行时间

获取原文

摘要

In case of a metro disruption, the collaborative optimization for train rescheduling combined with passenger flow demand is quite essential since passenger flow is not adequately considered. To handle this gap, this study first establishes two separated optimization models, i.e. train rescheduling model and passenger flow model. On train side, short-turnings, fully cancellation or partial cancellation are taken into account to construct the disrupted timetable with the aims of minimizing train delays and timetable deviations from the original timetable. On passenger side, time-dependent OD passenger demand is incorporated into passenger’s arrival, passenger’s loading and alighting process. Then, an iterative framework is proposed to interact these two models. In each iteration loop, random short-turnings and cancellations are applied to calculate new departure and arrival for the services. Next, the corresponding departure time and arrival time is transferred to passenger flow model to evaluate the impacts on passenger’s travel time and the numbers of stranded passengers. The iterative results illustrates that less short-turning can effectively mitigate the numbers of stranded passengers at platforms but it comes at the cost of increasing train delays and passenger travel time. Cancelling trains can help to reduce passenger travel time as well but it should avoid causing heavier train delays to other non-cancelled services. Therefore, reasonable numbers of short-turnings and cancellations during disruption is trade-off between train delays and passenger delays during disruptions.
机译:如果发生了地铁的破坏,火车重新安排的协作优化与客流需求相结合,因为客流未被充分考虑。为了处理这一差距,本研究首先建立了两个分离的优化模型,即火车重新安排模型和乘客流量模型。在火车侧,短车削,完全取消或部分取消应考虑到构建中断的时间表,其目的是最小化火车延误和与原始时间表的时间表偏差。在乘客方面,时间依赖的OD乘客需求被纳入乘客到来,乘客装载和上升过程。然后,提出了一种迭代框架来交互这两个模型。在每次迭代循环中,应用随机的短车削和取消来计算新的出发和到达服务。接下来,相应的出发时间和到达时间被转移到乘客模型,以评估乘客旅行时间的影响和搁浅乘客的数量。迭代结果表明,较少的短路可以有效地减轻平台上搁浅的乘客的数量,但它以增加列车延误和乘客旅行时间的成本。取消列车可以帮助减少乘客旅行时间,但它应该避免对其他未取消的服务造成较重的火车延误。因此,中断期间的合理数量的短车削和取消是在中断期间列车延误和乘客延误之间的权衡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号