首页> 外文会议>International pipeline conference >HIGH PRESSURE GAS PIPELINE INSTALLATION INSIDE A LONG LENGTH AND SMALL CROSS-SECTION MOUNTAIN TUNNEL
【24h】

HIGH PRESSURE GAS PIPELINE INSTALLATION INSIDE A LONG LENGTH AND SMALL CROSS-SECTION MOUNTAIN TUNNEL

机译:高压气体管道安装在长长度和小横截面山隧道内

获取原文

摘要

The gas pipeline called "Mie-Shiga Pipeline" (60km total length, 610mm diameter, 7MPa maximum pressure, grade L450 (X65)) is under joint construction between Chubu Electric Power Co., Inc. and Osaka Gas Co., Ltd. This pipeline is planned to start supplying gas in 2014. Since the main part of our construction area is in a mountainous area called Suzuka Mountains, the mountain tunneling method is adopted in part of the mountainous area (about 7.5km in length) for gas pipeline installation to shorten the construction period. This paper discusses the design concept and the highly efficient technique for installing pipeline inside a long length and small cross-section mountain tunnel, as well as the application of an internal watertight wall, which is a task specific to the mountain tunnel.
机译:呼气管道称为“Mie-Shiga管道”(60km总长度,直径610mm,最大压力7MPa最大压力,L450(x65)是楚布电力有限公司和大阪天然气有限公司之间的联合建设计划在2014年计划开始供应天然气。由于我们建筑面积的主要部分是山区山区,山区隧道方法是在山区(长度约7.5km)的一部分用于燃气管道安装缩短施工期。本文讨论了在长长和小横截面山隧道内安装管道的设计理念和高效技术,以及内部防水墙的应用,这是山隧道特有的任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号