首页> 外文会议>IEEE International Conference on eScience >Trials and Tribulations of the UK National Grid Service
【24h】

Trials and Tribulations of the UK National Grid Service

机译:英国国家电网服务的试验和培训

获取原文

摘要

The UK National Grid Service (NGS) is responsible for standardized access to data and compute resources across UK academia regardless of research area. The NGS has been in production for four years and is currently in its second iteration with planning for NGS III currently at an advanced stage. This paper will examine the organizational structure of the NGS which has a distributed structure across four core sites as well as partner and affiliate sites. Management structures including details of the responsibilities of the five main NGS management boards are discussed as well as the benefits and disadvantages of the current structure. Due to the distributed nature of the NGS, challenges in managing are apparent and need to be tackled. Several of these challenges are described in this paper along with the actions taken by the NGS management to address these issues.
机译:英国国家电网服务(NGS)负责无论研究区如何,都有标准化对英国学术界的数据和计算资源。 NGS已经在生产了四年,目前正在第二次迭代,规划目前处于高级阶段的NGS III。本文将研究跨四个核心站点的分布式结构的NGS的组织结构以及合作伙伴和联盟网站。管理层结构包括讨论五个主要的NGS管理委员会责任的细节以及当前结构的益处和缺点。由于NGS的分布性质,管理中的挑战是明显的,并且需要解决。本文中描述了几种这些挑战以及NGS管理采取的行动来解决这些问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号