首页> 外文会议>International Forum on Strategic Technology >Study for Pit Optimization of Baganuur Coal Mine's Southern Section
【24h】

Study for Pit Optimization of Baganuur Coal Mine's Southern Section

机译:蒲甘煤矿南部坑优化研究

获取原文

摘要

It is 28 years since the exploitation commenced on the Baganuur brown coal deposit. The project institution, GyproShakht, divided the deposit into 5 separate mining sections and one preserve section. According to the initial project, mining begins in the 1st and 2nd sections and then proceed through the sections 3rd and 4th. It decided the mining to be finished by the section 5th and left the preserved section to be analyzed later. But the mining operation has been commencing on the southern part of the 5th section during the last 30 years and there is another strip (named as a New Section) has been opened since 1999. It means that the mining strategy and sequence in the initial project has been changed accordingly.
机译:自剥削开始以来,这是28年开始,棕褐色棕色煤矿矿床。项目机构GyproShakht将存款分成5个单独的采矿部分和一个保留部分。根据初始项目,挖掘在第1和第2部分开始,然后通过第3和第4节进行。它决定由第5节完成的采矿,并将保存的部分留出以后分析。但是,矿业运营在过去30年内开始于第五部分的南部,并且自1999年以来已经开通了另一条带(被命名为新部分)。这意味着初始项目中的采矿策略和序列已相应改变。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号