Should Remediation and Restoration Projects Factor in a Changing Climate?

机译:修复和恢复项目是否应将因素纳入气候变化?

获取原文

摘要

Understanding Climate Risks for Remediation and Restoration Projects. Remediationand restoration projects are usually designed and developed based on historicalclimatic conditions and existing local exposure to coastal processes and flooding. Thisposes a significant risk to the remediation industry, site owners and operators if thesesites do not meet the challenge of changing climatic conditions.How exposed are existing sites to increases in extreme rainfall generating flooding orsea level rise causing coastal erosion, salt water intrusion and reducing drainagecapacity? Key climate risks to remediation and restoration projects will be identifiedbased on observed trends and projected changes in climatic conditions.Radium Hill Mine and Port Pirie Climate Risk Assessment Case Study. The RadiumHill Mine and Port Pirie Climate Risk Assessment in South Australia will be used as acase study to explore the potential climate impacts on mining activity and waste contaminationcontrol. The case study assessed mining and process waste storage facilities andport assets. The climate risk assessment formed part of the environmental impact assessmentfor the closure and future uses of the sites.There is uncertainty about future climatic conditions and timing so a strategic, riskbasedapproach was applied to respond to observed changes as well as projected changesin climate. The aim was to increase preparedness and resilience of site remediation andrestoration projects.Making Decisions in an Uncertain Climate. This presentation also explores the lessonslearnt from the “Optimizing Adaptation Investment” projects for the Australian GovernmentDepartment of Climate Change and Energy Efficiency including coastal urbanareas, water supply and rail infrastructure case studies. These projects are the first of theirkind in Australia and are considered internationally as a leading example of economiccost benefit analysis to inform decision making when responding to a changing climaticconditions.Effectively determining specific adaptation responses to climate change risks in termsof the range of options, the best scale of response for each option and importantly at whattime the solutions should be implemented for best value. Remediation and restorationprojects require the integration of climate risk into their decision making. The followingelements are important for informed decision making:1.Understanding the uncertainty of weather and climate change impacts2.Reducing the uncertainty through economic modeling and cost benefit analysistools3.Optimizing the right timing and scale of various solutions
机译:了解修复和修复项目的气候风险。整治 和修复项目通常是根据历史来设计和开发的 气候条件以及当地现有的沿海流程和洪水风险。这 如果这些因素对修复行业,网站所有者和运营商构成重大风险 站点无法应对不断变化的气候条件的挑战。 现有站点如何承受极端降雨的增加而引发洪水或洪水 海平面上升导致海岸侵蚀,盐水入侵并减少排水 容量?将确定修复和恢复项目的主要气候风险 根据观察到的趋势和气候条件的预计变化。 镭山矿山和皮里港气候风险评估案例研究。镭 南澳大利亚的Hill Mine和Port Pirie港口气候风险评估将被用作 案例研究,探讨气候对采矿活动和废物污染的潜在影响 控制。案例研究评估了采矿和过程废物存储设施以及 港口资产。气候风险评估是环境影响评估的一部分 用于网站的关闭和将来使用。 未来的气候条件和时机存在不确定性,因此基于风险的战略性策略 方法被用于响应观察到的变化以及预计的变化 在气候中。目的是提高场地整治的准备和复原力, 恢复项目。 在不确定的环境中做出决定。本演示文稿还探讨了教训 从澳大利亚政府的“优化适应投资”项目中获悉 气候变化与能源效率部,包括沿海城市 地区,供水和铁路基础设施案例研究。这些项目是他们的第一个 是澳大利亚的一种,在国际上被认为是经济的典范。 成本效益分析,以在应对气候变化时为决策提供依据 情况。 有效地确定应对气候变化风险的具体适应措施 选项范围,每个选项的最佳响应范围以及重要的是 实施解决方案以获得最佳价值的时间。修复与恢复 项目需要将气候风险纳入其决策中。以下 要素对于明智的决策至关重要: 1,了解天气和气候变化影响的不确定性 2,通过经济建模和成本效益分析减少不确定性 工具 3,优化各种解决方案的正确时机和规模

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号