首页> 外国专利> Stochastic Estimating Model for Calculating Duration of Super-tall Building Project using Vertical Climate Factors

Stochastic Estimating Model for Calculating Duration of Super-tall Building Project using Vertical Climate Factors

机译:利用垂直气候因子计算超高层建筑工期的随机估计模型

摘要

PURPOSE: A skyscraper construction project construction duration predicting system considering a weather factor's vertical changes quantitatively predicts a weather factor's possible influence on construction activities based on weather information in a database and generates quantitative data by predicting possible changes of the weather factor due to increases in altitude. CONSTITUTION: A climatological data processing module (A1) generates weather distribution data of a reference weather value using weather values in a weather database (D1). A climatological data simulation module (A2) generates a set of weather values regarding a specific schedule. An altitude-specific weather data generation module (A3) generates another set of weather values regarding a specific altitude. A non-workable day calculation module (B1) compares the altitude-specific set of weather values with a pre-determined non-workable day standard. A process simulation module (B2) successively carries out a simulation process on the entire processes. A construction duration analysis module (B3) analyzes data about process-specific duration for each process and the entire duration of a construction project transmitted by the process simulation module. [Reference numerals] (A) Weather data generating module; (A1) Weather data processing module; (A2) Weather simulation module; (A3) Weather data by altitude generation module; (B) Air calculation simulation module; (B1) Non-working day calculation module; (B2) Process simulation module; (B3) Construction duration analysis module; (D1) Weather database; (D2) Process database; (D3) Workability standard database
机译:目的:考虑天气因素垂直变化的摩天大楼建设项目工期预测系统,根据数据库中的天气信息定量预测天气因素对施工活动的可能影响,并通过预测由于海拔升高而引起的天气因素可能的变化,生成定量数据。组成:气候数据处理模块(A1)使用天气数据库(D1)中的天气值生成参考天气值的天气分布数据。气候数据模拟模块(A2)生成一组与特定时间表有关的天气值。高度特定的天气数据生成模块(A3)生成另一组与特定高度有关的天气值。不可工作日计算模块(B1)将特定于海拔的天气值集与预定的不可工作日标准进行比较。过程仿真模块(B2)对整个过程依次执行仿真过程。施工工期分析模块(B3)分析有关每个过程的特定于工艺的工期以及由过程仿真模块传输的建设项目整个工期的数据。 [附图标记](A)天气数据生成模块; (A1)天气数据处理模块; (A2)天气模拟模块; (A3)高度生成模块的天气数据; (B)空气计算模拟模块; (B1)非工作日计算模块; (B2)过程模拟模块; (B3)工期分析模块; (D1)天气数据库; (D2)流程数据库; (D3)可加工性标准数据库

著录项

  • 公开/公告号KR101379407B1

    专利类型

  • 公开/公告日2014-03-28

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20130015836

  • 发明设计人 이현수;정민혁;박문서;

    申请日2013-02-14

  • 分类号G06Q50/08;

  • 国家 KR

  • 入库时间 2022-08-21 15:41:13