首页> 外文会议>International Conference on Advances in Electrical Engineering >A feasibility study of mini hydroelectric power plant at Sahasradhara waterfall, Sitakunda, Bangladesh
【24h】

A feasibility study of mini hydroelectric power plant at Sahasradhara waterfall, Sitakunda, Bangladesh

机译:麦利水电站撒哈拉斯拉哈拉瀑布,塔克杜达,孟加拉国的可行性研究

获取原文
获取外文期刊封面目录资料

摘要

Electricity production from hydropower has been, and still is today, the first renewable source used to generate electricity. This paper discusses the scope of developing a mini hydropower station at Sahasradhara waterfall in the Sitakunda upazila in the district of Chittagong, Bangladesh. In this research work, we are mainly concerned with providing an estimation of the output power to establish a mini hydroelectric power plant at Sahasradhara waterfall. The float method is used to measure flow rate and output power. From our survey it is found that Sahasradhara waterfall would be sustainable for a mini hydroelectric power plant with its head and available flow rate.
机译:水电站的电力生产已有,仍然是今天,第一个可再生源用于发电。本文讨论了在孟加拉国芝加哥农区的锡达德达府安萨哈拉德哈拉瀑布开发迷你水电站的范围。在这项研究工作中,我们主要涉及在萨哈拉哈拉瀑布建立迷你水力发电厂的输出能力估算。浮法方法用于测量流速和输出功率。从我们的调查开始,发现Sahasradhara瀑布将可持续迷你水力发电设备,其头部和可用的流量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号