The K-7 and I-70 interchange is a proposed project set forth to accommodate the growingcity of Bonner Springs, KS as well as increase the traffic flow into Kansas City. Currently this isthe second (2nd) busiest interchange in all of Kansas City. Approximately 145,000 vehicles a daytravel through the existing major system to system interchange. The design for the proposedinterchange includes expansion of existing I-70 and K-7 to accommodate the traffic volumeprojected in the future as well as construction of new ramps and collector roads.The project has ten (10) proposed phases. To date, KDOT has completed Phases 1through 3, which are associated with the expansion of I-70 to six lanes, construction of new loopramps in both the northwest and southwest quadrants of the existing K-7 and I-70 Interchangeand two (2) bridge replacements at Riverview Ave. and 118th St. We have portions of Phases 4and 9 completed and are preparing to begin work on the remainder of Phase 4 and Phase 6.The management of what has been done and what needs to be done has been achallenging obstacle that we faced since the project began. Since our geothechnical investigationhas started, we have had to be flexible on which Phase we could work on due to landownerpermission, right of way acquisition, designer needs, and information availability. We have alsohad to revisit and re-drill due to changes in design and site access. The geology of the site hasposed many obstacles alone. In this area, the Tonganoxie Sandstone Member lies disconformablyon the Stanton Formation where it cuts through the Iatan Limestone and Weston Shale Members.This disconformity developed by the infilling of existing deep erosional channels during thedeposition. The Tonganoxie Sandstone encountered across the majority of the site contains thicksequences of fine grained, cross-bedded sandstone with several thin, non-continuous,interbedded sandy shales.To date there have been over 200 power auger borings performed for approximately 5miles of surface geology investigation and 3 bridge foundation investigations. KDOT’sgeotechnical investigation on the proposed infrastructure continues to be done as needed throughthis developing suburb of Kansas City. Construction is set to start early in 2013 on Phase 2 andletting date of mid 2013 for Phases 1 through 3. The remaining phases do not have let dates atthis time.As the state of Kansas grows, so does the need for development and improvement of ourinfrastructure. As geologists, we need to ensure that we provide the most accurate preliminarydesign information possible.
机译:K-7和I-70交汇处是一个拟议的项目,旨在适应不断增长的需求 堪萨斯州邦纳斯普林斯市以及增加进入堪萨斯城的交通流量。目前这是 堪萨斯城内第二(第二)最繁忙的交汇处。每天约145,000辆车 通过现有的主要系统进行系统互换。拟议的设计 互换包括扩展现有的I-70和K-7以适应交通量 未来的规划以及新的坡道和收集路的建设。 该项目有十(10)个提议的阶段。迄今为止,KDOT已完成第一阶段 到3,这与将I-70扩展到6条车道有关,构建了新的环路 现有K-7和I-70交汇处的西北和西南象限都有坡道 以及Riverview Ave.和118th St.的两(2)座桥更换项目。我们有第4阶段的一部分 已完成第9阶段和第9阶段的工作,并准备开始进行第4阶段和第6阶段的其余工作。 对已经完成的工作和需要完成的工作的管理一直是 自项目开始以来我们面临的具有挑战性的障碍。自从我们的地球技术调查 已经开始,由于土地所有者的原因,我们必须灵活地决定可以进行哪个阶段的工作 许可,通行权获取,设计者需求和信息可用性。我们也有 由于设计和站点访问权限的更改,必须重新访问和重新钻探。该站点的地质 独自构成了许多障碍。在这个地区,汤加纳西砂岩地带令人难以置信 在斯坦顿岩层上,穿过伊坦石灰岩和韦斯顿页岩区。 这种不一致性是由于在填埋期间充填了现有的深层侵蚀通道而形成的。 沉积。大部分地区遇到的汤加诺谢砂岩都含有厚 细粒,层状砂岩的序列,其中有几个薄的,非连续的, 夹层砂质页岩。 迄今为止,已经进行了200多次电钻钻孔,大约进行了5次钻孔 英里的地表地质调查和3座桥梁基础调查。 KDOT的 对拟议基础设施的岩土工程调查将继续根据需要通过以下方式进行: 堪萨斯城这个发展中的郊区。该项目计划于2013年初在第二阶段开始建设, 第1到第3阶段的出租日期为2013年中期。其余阶段的出租日期为 这次。 随着堪萨斯州的发展,对我们的发展和改善的需求也在增加 基础设施。作为地质学家,我们需要确保我们提供最准确的初步 可能提供设计信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号