Geotechnical Investigation for the K-7 and I-70 Interchange Bonner Springs, Kansas

机译:K-7和I-70 Interchange Bonner Springs,堪萨斯州的岩土工程调查

获取原文

摘要

The K-7 and I-70 interchange is a proposed project set forth to accommodate the growing city of Bonner Springs, KS as well as increase the traffic flow into Kansas City. Currently this is the second (2nd) busiest interchange in all of Kansas City. Approximately 145,000 vehicles a day travel through the existing major system to system interchange. The design for the proposed interchange includes expansion of existing I-70 and K-7 to accommodate the traffic volume projected in the future as well as construction of new ramps and collector roads. The project has ten (10) proposed phases. To date, KDOT has completed Phases 1 through 3, which are associated with the expansion of I-70 to six lanes, construction of new loop ramps in both the northwest and southwest quadrants of the existing K-7 and I-70 Interchange and two (2) bridge replacements at Riverview Ave. and 118th St. We have portions of Phases 4 and 9 completed and are preparing to begin work on the remainder of Phase 4 and Phase 6. The management of what has been done and what needs to be done has been a challenging obstacle that we faced since the project began. Since our geothechnical investigation has started, we have had to be flexible on which Phase we could work on due to landowner permission, right of way acquisition, designer needs, and information availability. We have also had to revisit and re-drill due to changes in design and site access. The geology of the site has posed many obstacles alone. In this area, the Tonganoxie Sandstone Member lies disconformably on the Stanton Formation where it cuts through the Iatan Limestone and Weston Shale Members. This disconformity developed by the infilling of existing deep erosional channels during the deposition. The Tonganoxie Sandstone encountered across the majority of the site contains thick sequences of fine grained, cross-bedded sandstone with several thin, non-continuous, interbedded sandy shales. To date there have been over 200 power auger borings performed for approximately 5 miles of surface geology investigation and 3 bridge foundation investigations. KDOT’s geotechnical investigation on the proposed infrastructure continues to be done as needed through this developing suburb of Kansas City. Construction is set to start early in 2013 on Phase 2 and letting date of mid 2013 for Phases 1 through 3. The remaining phases do not have let dates at this time. As the state of Kansas grows, so does the need for development and improvement of our infrastructure. As geologists, we need to ensure that we provide the most accurate preliminary design information possible.
机译:K-7和I-70 Interchange是一个拟议的项目,以适应不断增长的Bonner Springs,Ks的城市,以及将交通流量增加到堪萨斯城。目前,这是堪萨斯城所有第二(第二)最繁忙的交汇处。每日大约145,000辆车通过现有的主要系统进行系统交汇处。所提出的交汇处的设计包括扩展现有I-70和K-7,以适应未来投影的交通量以及新坡道和集成器道路的建设。该项目有十(10)个阶段。迄今为止,KDOT已完成阶段1到3,与I-70至六个车道的扩展相关,在现有K-7和I-70交汇处的西北和西南象限中建造新的回路坡道。 (2)Riverview Ave的桥梁替代品。和第118届ST.我们有部分阶段4和9完成,并准备开始在剩余的第4阶段和第6阶段工作。对所做的事情进行管理以及需要的东西完成以来,这是一个挑战的障碍,以至于该项目开始以来。由于我们的地球化学调查已开始,我们必须灵活地在哪个阶段,我们可以由于土地所有者许可,可获得的方式,设计师需求和信息可用性而工作。由于设计和现场访问的变化,我们也必须重新审视和重新钻取。该网站的地质仅构成了许多障碍。在这个领域,汤诺诺砂岩成员在斯坦顿的形成上令人难以置疑地脱节,其中它通过Iatan石灰石和Weston页岩成员切割。这种Disconformity通过在沉积期间渗透现有的深层侵蚀通道而开发。围绕大多数遗址遇到的汤诺昔斯砂岩含有厚序列的细粒度,横跨砂岩,几种薄,非连续,互壁的沙子。迄今为止,已经有200多个电动螺旋钻,为大约5英里的地表地质调查和3个桥梁基础调查进行了大约5英里。 KDOT对拟议基础设施的岩土工业调查继续根据堪萨斯城郊区根据需要完成。建设将于2013年初开始于2013年初开始,并在第1到3阶段举行2013年中期的日期。剩下的阶段在此时没有让日期。随着堪萨斯州的发展,我们的基础设施的发展和改善需要。作为地质学家,我们需要确保我们提供最准确的初步设计信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号