首页> 外文会议>COTA international conference of transportation professionals >Structural Inverse Conversion Analysis on Removal of Closure Segment in Prestressed Concrete Cable-stayed Bridges
【24h】

Structural Inverse Conversion Analysis on Removal of Closure Segment in Prestressed Concrete Cable-stayed Bridges

机译:预应力混凝土斜拉桥封闭段拆除的结构逆转换分析

获取原文

摘要

Removal of the old closure segment was the precondition for replacement. Compared with the closure of a new bridge, removal of the closure segment was a structural inverse conversion process. To establish an effective analysis method for this process, an approach for establishing a structural basement calculation model, based on the current inspecting results, was provided. The method considered the original construction process, operational factors of existing prestressed concrete cable-stayed bridges, and model updating techniques to achieve the structural state simulation before the removal of the closure segment. According to the removal construction sequence, the structural mode changes during the removal of the closure segment. The construction monitoring results showed, this method could reflect the actual structural state. The simulated results could well meet with the measured values. The structural inverse conversion analysis could provide the basis for construction control of removing closure segment, and is an important component of the strengthening theory on replacement of the closure segment.
机译:拆除旧的封闭部分是更换的先决条件。与关闭新桥相比,关闭桥段的拆除是结构上的逆转换过程。为了为该过程建立有效的分析方法,提供了一种基于当前检查结果建立结构地下室计算模型的方法。该方法考虑了原始施工过程,现有预应力混凝土斜拉桥的操作因素以及模型更新技术,以在拆除封闭段之前实现结构状态模拟。根据拆卸构造顺序,在封闭段拆卸期间结构模式发生变化。施工监测结果表明,该方法可以反映实际的结构状态。仿真结果与实测值吻合较好。结构逆转换分析可以为拆除封闭段提供控制依据,是加强封闭段更换理论的重要组成部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号