首页> 外文会议>Electronic System-Integration Technology Conference >Study on Drilling and completion techniques of horizontal well for coalbed methane in Binchang mining area
【24h】

Study on Drilling and completion techniques of horizontal well for coalbed methane in Binchang mining area

机译:滨城矿区煤层气水平井钻井和完井技术研究

获取原文

摘要

Due to the unique reservoir characteristics of the coalbed methane (CBM) in China, many technical problems have to be studied and solved in the development of horizontal wells for CBM. In this paper, based on the V-type wells, we have summarized the many techniques involved in Drilling and completion of horizontal well for CBM in Binchang mining area, such as leakage protection and sealing, geosteering while drilling, remote connection, variable density cementing, Coal seam cavitation, fiberglass casing running into the well, and etc. It is pointed out that the air foam under-balance drilling will be the development direction for coalbed methane drilling technology.
机译:由于中国煤层气(CBM)的独特储层特征,必须在液晶井的发展中进行许多技术问题,用于CBM。本文基于V型井,我们总结了在滨城矿区挖掘机煤层钻井和完成钻井和完成的许多技术,如泄漏保护和密封,钻孔,远程连接,可变密度胶结时,煤层空化,玻璃纤维套管进入井等。指出,空气泡沫欠平衡钻井将是煤层气钻井技术的发展方向。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号