首页> 外文会议>Electronic System-Integration Technology Conference >Study on Drilling and completion techniques of horizontal well for coalbed methane in Binchang mining area
【24h】

Study on Drilling and completion techniques of horizontal well for coalbed methane in Binchang mining area

机译:宾昌矿区煤层气水平井钻井完井技术研究。

获取原文

摘要

Due to the unique reservoir characteristics of the coalbed methane (CBM) in China, many technical problems have to be studied and solved in the development of horizontal wells for CBM. In this paper, based on the V-type wells, we have summarized the many techniques involved in Drilling and completion of horizontal well for CBM in Binchang mining area, such as leakage protection and sealing, geosteering while drilling, remote connection, variable density cementing, Coal seam cavitation, fiberglass casing running into the well, and etc. It is pointed out that the air foam under-balance drilling will be the development direction for coalbed methane drilling technology.
机译:由于中国煤层气(CBM)独特的储层特征,在开发煤层气水平井时必须研究和解决许多技术问题。本文以V型井为基础,总结了宾昌矿区煤层气水平井钻探和完井涉及的多种技术,包括防漏与密封,随钻地质导向,远程连接,变密度固井等。 ,煤层气蚀,玻璃纤维套管钻入井内等。指出,泡沫欠平衡钻井将成为煤层气钻井技术的发展方向。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号