Enhancement of NRC Station Blackout Requirements for Nuclear Power Plants

机译:加强NRC站核电厂停电要求

获取原文

摘要

The U.S. Nuclear Regulatory Commission (NRC) established a Near-Term Task Force (NTTF) in response to Commission direction to conduct a systematic and methodical review of NRC processes and regulations to determine whether the agency should make additional improvements to its regulatory system and to make recommendations to the Commission for its policy direction, in light of the accident at the Fukushima Dai-ichi Nuclear Power Plant. The NTTF's review resulted in a set of recommendations that took a balanced approach to defense-in-depth as applied to low-likelihood, high-consequence events such as prolonged station blackout (SBO) resulting from severe natural phenomena. Part 50, Section 63, of Title 10 of the Code of Federal Regulations (CFR), "Loss of All Alternating Current Power, " currently requires that each nuclear power plant must be able to cool the reactor core and maintain containment integrity for a specified duration of an SBO. The SBO duration and mitigation strategy for each nuclear power plant is site specific and is based on the robustness of the local transmission system and the transmission system operator's capability to restore off site power to the nuclear power plant. With regard to SBO, the NTTF recommended that the NRC strengthen SBO mitigation capability at all operating and new reactors for design-basis and beyond-design-basis external events. The NTTF also recommended strengthening emergency preparedness for prolonged SBO and multiunit events. These recommendations, taken together, are intended to clarify and strengthen US nuclear reactor safety regarding protection against and mitigation of the consequences of natural disasters and emergency preparedness during SBO. The focus of this paper is on the existing SBO requirements and NRC initiatives to strengthen SBO capability at all operating and new reactors to address prolonged SBO stemming from design-basis and beyond-design-basis external events. The NRC initiatives are intended to enhance core and spent fuel pool cooling, reactor coolant system integrity, and containment integrity.
机译:美国核监管委员会(NRC)成立了近期工作队(NTTF),以响应委员会方向,对NRC进程和法规进行系统和有条不紊的审查,以确定原子能机构是否应对其监管系统进行额外改进根据Fukusima Dai-Ichi核电站的事故,根据事故提出向委员会提出建议。 NTTF的审查导致了一系列建议,该建议采取了适用于低似然性,高后果事件的抗辩方法,例如严重的自然现象导致的长期停电(SBO)。第50部分,联邦法规守则的第63部分第63部分(CFR),“丢失所有交流能力”,目前要求每个核电站必须能够冷却反应堆核心并保持指定的遏制完整性SBO的持续时间。每个核电站的SBO持续时间和缓解策略是特定的,基于本地传输系统的鲁棒性和传输系统操作员能够将现场电力恢复到核电厂的能力。关于SBO,NTTF建议NRC加强所有经营和新反应堆的SBO缓解能力,用于设计基础和超越设计基础外部事件。 NTTF还建议加强延长SBO和多单事件的应急准备。组合在一起的这些建议旨在澄清和加强美国核反应堆安全性关于防止和缓解自然灾害和应急准备期间的保护。本文的重点是现有的SBO要求和NRC举措,以加强所有经营和新反应堆的SBO能力,以应对从设计基础和超越设计基础外部事件的延长的SBO。 NRC举措旨在增强核心和燃料池冷却,反应堆冷却剂系统完整性和遏制完整性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号