Saltcoats Flood Prevention Scheme: Analysis, Design and Construction

机译:Saltcoats防洪方案:分析,设计和施工

获取原文

摘要

This paper has described the development of the Saltcoats Flood Prevention Scheme through the analysis, design and construction phases. The previous flood prevention measures in Saltcoats were insufficient to prevent flooding of the community from overtopping of the sea walls. A total of 345 properties are at risk from flooding. Without the investment in flood alleviation, the present value flood damage losses in Saltcoats would exceed £18.4m over the next 100 years or £552m without discounting. The initial investigations into the physical processes defined the problem of flood risk to the town, the benefits of building the scheme and any constraints on construction. Consultation identified the impacts on amenity use and the geological SSSI and gained the support of the local community for a flood alleviation scheme. A broad range of flood alleviation scheme options were investigated and a short list developed. Technical, environmental and economic appraisal enabled selection of a preferred option. The scheme is economically justified with a cost of £1.96million and a positive benefit cost ratio of 8.9. The scheme was developed in detail during the design phase, and includes rock armour breakwaters within the harbour and the reconstruction of defences with raised defence crest levels at the south end of South Bay. The scheme provides a standard of flood protection of at least 1 in 250 years based on current sea levels and wave conditions. Taking into account the most recent recommendations regarding climate change, the defence standard after 50 years will be about 1:80 years. The construction impacts of the scheme on the environment were minimised throughout the design. Environmental improvement measures were incorporated into the scheme including viewing areas at the sea wall end of the rock breakwaters, improved access to the foreshore and interpretation boards describing the foreshore geology and other interesting local features. Substantial completion of the construction phase was achieved in September 2008. The construction costs presented to date are just under £2m and similar to those estimated at outline design stage.
机译:本文描述了通过分析,设计和施工阶段开发盐涂层防洪方案。以前的盐涂层防洪措施不足以防止社区洪水从海面覆盖。洪水共有345个物业面临风险。如果没有投资洪水缓解,目前价值洪水损失在未来100年或55.2米的情况下超过18.4米,而无需折扣。对物理流程的初步调查将洪水风险问题定义对城镇的洪水风险,建立方案的好处和建设的任何限制。咨询确定了对舒适性的影响和地质SSSI,并获得了当地社区对洪水缓解计划的支持。调查了广泛的洪水缓解计划选项,并开发了一个简短的名单。技术,环境和经济评估能够选择优选的选择。该方案经济上的合理性,成本为1.96亿英镑,积极福利成本比为8.9。该方案在设计阶段进行了详细开发,包括港口内的摇滚铠装防滑,并在南湾南端进行防御嵴水平的防御。该方案根据当前海平面和波条条件提供250岁的洪水保护标准。考虑到有关气候变化的最新建议,50年后的国防标准将是1:80。整个设计中最小化了方案对环境的施工影响。将环境改进措施纳入该方案,包括岩石防波堤海墙末端的观察区域,改善了对普通地质和其他有趣的当地特征的前列和解释板的进入。 2008年9月实现了建设阶段的实质性完成。迄今提出的施工成本仅为200万英镑,与概述设计阶段估计的建造费用相似。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号