This paper has described the development of the Saltcoats Flood Prevention Scheme through the analysis, design and construction phases. The previous flood prevention measures in Saltcoats were insufficient to prevent flooding of the community from overtopping of the sea walls. A total of 345 properties are at risk from flooding. Without the investment in flood alleviation, the present value flood damage losses in Saltcoats would exceed £18.4m over the next 100 years or £552m without discounting. The initial investigations into the physical processes defined the problem of flood risk to the town, the benefits of building the scheme and any constraints on construction. Consultation identified the impacts on amenity use and the geological SSSI and gained the support of the local community for a flood alleviation scheme. A broad range of flood alleviation scheme options were investigated and a short list developed. Technical, environmental and economic appraisal enabled selection of a preferred option. The scheme is economically justified with a cost of £1.96million and a positive benefit cost ratio of 8.9. The scheme was developed in detail during the design phase, and includes rock armour breakwaters within the harbour and the reconstruction of defences with raised defence crest levels at the south end of South Bay. The scheme provides a standard of flood protection of at least 1 in 250 years based on current sea levels and wave conditions. Taking into account the most recent recommendations regarding climate change, the defence standard after 50 years will be about 1:80 years. The construction impacts of the scheme on the environment were minimised throughout the design. Environmental improvement measures were incorporated into the scheme including viewing areas at the sea wall end of the rock breakwaters, improved access to the foreshore and interpretation boards describing the foreshore geology and other interesting local features. Substantial completion of the construction phase was achieved in September 2008. The construction costs presented to date are just under £2m and similar to those estimated at outline design stage.
机译:本文通过分析,设计和施工阶段,描述了“防盐衣防洪计划”的发展。先前在Saltcoats中的防洪措施不足以防止社区的洪灾超过海堤的高度。共有345处房屋遭受洪水威胁。如果不进行防洪投资,Saltcoats的现值洪灾损失在未来100年将超过1,840万英镑,如果不折现,将超过5.52亿英镑。对物理过程的初步调查确定了城镇遭受洪灾的风险,建造该方案的好处以及对施工的任何限制。磋商会确定了对便利设施使用和地质SSSI的影响,并获得了当地社区对防洪计划的支持。研究了广泛的防洪方案选择,并制定了一个简短的清单。通过技术,环境和经济评估,可以选择首选方案。该计划在经济上是合理的,成本为196万英镑,正收益成本比为8.9。该计划在设计阶段进行了详细开发,包括港口内的岩石装甲防波堤以及在南湾南端的防御波峰水平升高的防御工事的重建。根据当前的海平面和海浪状况,该计划提供的防洪标准至少为每250年1次。考虑到有关气候变化的最新建议,50年后的国防标准将约为1:80年。在整个设计过程中,该方案对环境的影响最小。该计划中纳入了环境改善措施,包括在岩石防波堤的海壁端观看区域,改善通往前滩的通道以及描述前滩地质和其他有趣的当地特征的解释委员会。施工阶段已于2008年9月基本完成。迄今为止,施工成本略低于200万英镑,与概要设计阶段的估算费用相似。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号