Geotechnical Designs to Build on Liquefiable and Compressible Soil in Salem, Massachusetts

机译:马萨诸塞州塞勒姆液化和可压缩土的岩土工程设计

获取原文

摘要

The Massachusetts Bay Transportation Authority (MBTA) is addressing accessibility throughout their facilities. Improvements at the Commuter Rail Station in Salem, Massachusetts include a five-level parking garage replacing the existing parking lot, a pedestrian bridge replacing the existing stairway connecting track level with downtown Salem, two accessible elevators, and a full-length accessible high-level platform. Subsurface explorations at the site encountered fill overlying loose, potentially liquefiable saturated sands, overlying soft marine clay deposits extending to till and rock at about 60 to 80 feet depth. Deep foundations bearing on rock were recommended for structural support of the garage, bridge, and platform. Ground improvement using vibratory stone columns (VSCs) was also recommended to address the liquefaction and lateral spreading potential, and to improve the seismic site classification from Class F to Site Class E. The project team evaluated value-engineering options. The final design included the installation of over 470 Controlled Modulus Columns? below the garage and bridge footings. Over 825 VSCs up to 30 feet in depth were installed below the parking garage and platform. Post-VSC treatment testing was conducted during construction to review compliance with the specified performance criteria. The cooperative design and installation required coordination between the design and construction teams to maximize cost and schedule efficiency for the project. These methods allowed the project to move forward, ultimately saving the client millions of dollars in construction costs.
机译:马萨诸塞海湾运输当局(MBTA)是解决辅助整个设施。在通勤火车站塞勒姆的改进,马萨诸塞州包括五级停车库取代现有的停车场,人行天桥取代现有的楼梯连接轨道水平塞伦市中心,两个可电梯和全长接近高层平台。在现场遇到的填充地下探险覆松动,可能液化的饱和砂土,上覆以约60 80英尺的深度延伸到钱柜和岩石软海洋粘土矿床。建议对车库,桥梁和平台的结构支持建议岩石的深​​层基础。用振动石柱社区(VSC)地面改善还建议,以解决液化和横向扩展的潜力,以及提高从F级到站点E类项目小组评估价值工程方案的地震现场分类。最终的设计包括超过470个控制模柱的安装?下面的车库和桥梁地基。在825的VSC高达深30脚被安装在停车库和平台的下方。后VSC治疗试验是建设与指定的性能标准符合性审查期间进行。协同设计和安装所需的设计和施工团队之间的协调,以最大限度地提高成本和进度效率的项目。这些方法都使得这个项目向前推进,最终达到节省客户数百万美元的建设成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号