FLEET WIDE PURSUIT OF RISK-INFORMED INITIATIVE 5B - SURVEILLANCE FREQUENCY CONTROL PROGRAM (SFCP) AT EXELON NUCLEAR STATIONS

机译:舰队全力追捕风险相关的倡议5B-EXELON核电站的监视频率控制程序(SFCP)

获取原文

摘要

Exelon Nuclear's Limerick Generating Station (LGS) became the first plant to receive Nuclear Regulatory Commission (NRC) approval in September of 2006 to control its own surveillance test intervals via a Surveillance Frequency Control Program (SFCP). Exelon is now pursuing a fleet wide strategic initiative to implement the SFCP at its other nine (9) nuclear stations utilizing the regulatory framework established by the NRC. Exelon submitted license amendment requests (LARs) to the NRC for these nine stations in the 2009 and early 2010 timeframe. These LARs utilize Technical Specification Task Force (TSTF) traveler TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b" that was subsequently developed based on the LGS pilot and NEI methodology and was approved by the NRC. The NRC granted approval to Exelon's Peach Bottom Atomic Power Station in August of 2010, Oyster Creek Generating Station in September of 2010 and Three Mile Island Nuclear Station in January 2011. Exelon expects to receive approval from the NRC for the balance of its nuclear stations by early 2011. Implementation of the SFCP occurs within the timeframe approved by the NRC as specified in each site's respective license amendment request (LAR) and is typically sixty (60) or one hundred twenty (120) days. Implementation of the SFCP at all Exelon sites is expected to be completed by the mid 2011. Exelon will be adapting the SFCP process and procedures initially developed for Limerick to apply toward its entire nuclear fleet by the end of 2011. In the interim, sites are implementing the SFCP on a site-specific basis. This paper is sequel to a topical paper presented by Philip Tarpinian et al, titled "Implementation of a Risk-Informed Surveillance Frequency Control Program - A PRA Perspective" (Reference 1) at ANS PSA 2008 conference.
机译:Exelon Nuclear的利默里克发电站(LGS)成为2006年9月获得核监管委员会(NRC)批准的第一家工厂,该工厂通过监视频率控制程序(SFCP)控制其自己的监视测试间隔。 Exelon现在正在执行一项舰队范围的战略计划,以利用NRC建立的监管框架在其他九(9)个核电站实施SFCP。 Exelon分别在2009年和2010年初向NRC提交了这9个电视台的许可证修改请求(LARs)。这些LAR利用技术规范任务组(TSTF)旅行者TSTF-425,“将监视频率重新定位到被许可人控制-RITSTF Initiative 5b”,随后根据LGS飞行员和NEI方法开发了该方法,并获得了NRC的批准。 NRC于2010年8月批准了Exelon的桃底底部核电站,2010年9月的Oyster Creek发电站和2011年1月的三英里岛核电站获得了批准。Exelon预计将获得NRC的核电站余量批准。 SFCP的实施在每个站点各自的许可证修改请求(LAR)中指定的NRC批准的时间范围内进行,通常为六十(60)或一百二十(120)天。预计在2011年中期之前将在Exelon的所有场址实施SFCP。Exelon将采用最初为利默里克开发的SFCP程序和程序进行调整,以在2011年底前应用于其整个核舰队。在特定地点实施SFCP。本文是Philip Tarpinian等人在ANS PSA 2008会议上发表的题为“实施风险知情的监视频率控制程序-PRA观点”(参考1)的续篇。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号