首页> 外文会议>International topical meeting on probabilistic safety assessment and analysis >FLEET WIDE PURSUIT OF RISK-INFORMED INITIATIVE 5B - SURVEILLANCE FREQUENCY CONTROL PROGRAM (SFCP) AT EXELON NUCLEAR STATIONS
【24h】

FLEET WIDE PURSUIT OF RISK-INFORMED INITIATIVE 5B - SURVEILLANCE FREQUENCY CONTROL PROGRAM (SFCP) AT EXELON NUCLEAR STATIONS

机译:舰队广泛追求Exelon核动物站的风险通知的倡议5B - 监测频率控制计划(SFCP)

获取原文

摘要

Exelon Nuclear's Limerick Generating Station (LGS) became the first plant to receive Nuclear Regulatory Commission (NRC) approval in September of 2006 to control its own surveillance test intervals via a Surveillance Frequency Control Program (SFCP). Exelon is now pursuing a fleet wide strategic initiative to implement the SFCP at its other nine (9) nuclear stations utilizing the regulatory framework established by the NRC. Exelon submitted license amendment requests (LARs) to the NRC for these nine stations in the 2009 and early 2010 timeframe. These LARs utilize Technical Specification Task Force (TSTF) traveler TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b" that was subsequently developed based on the LGS pilot and NEI methodology and was approved by the NRC. The NRC granted approval to Exelon's Peach Bottom Atomic Power Station in August of 2010, Oyster Creek Generating Station in September of 2010 and Three Mile Island Nuclear Station in January 2011. Exelon expects to receive approval from the NRC for the balance of its nuclear stations by early 2011. Implementation of the SFCP occurs within the timeframe approved by the NRC as specified in each site's respective license amendment request (LAR) and is typically sixty (60) or one hundred twenty (120) days. Implementation of the SFCP at all Exelon sites is expected to be completed by the mid 2011. Exelon will be adapting the SFCP process and procedures initially developed for Limerick to apply toward its entire nuclear fleet by the end of 2011. In the interim, sites are implementing the SFCP on a site-specific basis. This paper is sequel to a topical paper presented by Philip Tarpinian et al, titled "Implementation of a Risk-Informed Surveillance Frequency Control Program - A PRA Perspective" (Reference 1) at ANS PSA 2008 conference.
机译:Exelon Unight的Limerick发电站(LGS)成为2006年9月收到核监管委员会(NRC)批准的植物,以通过监测频率控制计划(SFCP)来控制自己的监控测试间隔。 Exelon目前正在追求舰队广泛的战略倡议,以利用NRC制定的监管框架在其其他九(9)个核电台的SFCP。 Exelon在2009年和2010年初的时间框架中向NRC提交了许可证修订请求(LAR)。这些Lars利用技术规范任务力(TSTF)TSTF-425,“将监控频率重新定位到被许可人控制 - Ritstf计划5B”,随后基于LGS Pilot和NEI方法开发,并由NRC批准。 2010年9月oyster Creek发电站的NRC批准了Exelon桃子底部原子发电站,2011年9月和2011年1月的三英里岛核站。Exelon预计将获得NRC的批准,以便通过其核动站的余额2011年初。SFCP的实施发生在NRC的时间范围内,根据每个站点的各自许可修订请求(LAR)规定,通常是六十(60)或一百二十(120)天。所有Exelon网站的SFCP的实施预计将于2011年中期完成。Exelon将适应最初为利默里克开发的SFCP流程和程序,截至2011年底,申请整个核舰队。在临时,地点是以特定于特别的基础实现SFCP。本文是菲利普塔宾岛等人,以“风险通知的监控频率控制计划的实施 - ANS PSA 2008年会议”撰写的局部纸张续集。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号