Cost estimating the quality of stochastic network projects' portfolio

机译:估计随机网络项目组合质量的成本

获取原文

摘要

A highly complicated project management system in R&D design offices including several simultaneously realized PERT-COST type network projects, is considered. The projects are of different importance and significance; for each project its corresponding priority index is pregiven. The total budget at the project management disposal to carry out all the projects, is limited. Given for each project its priority value, the problem is to determine optimal budget assignments and optimal due dates of accomplishing each project, to maximize the weighted sum of the projects' utilities. Thus, the problem centers on maximizing the system's utility by implementing the harmonization model for each single project, which has been outlined in [1]. The problem's solution is based on redistributing the pregiven total project's portfolio budget among the projects in order to maximize the' summarized quality of the portfolio.
机译:考虑了在研发设计办公室中高度复杂的项目管理系统,其中包括多个同时实现的PERT-COST类型的网络项目。这些项目具有不同的重要性和意义;对于每个项目,其相应的优先级索引都已确定。用于执行所有项目的项目管理总预算是有限的。给每个项目以其优先级值,问题在于确定最佳预算分配和完成每个项目的最佳截止日期,以使项目效用的加权总和最大化。因此,问题集中在通过为每个单个项目实施协调模型来最大化系统的效用,这已在[1]中进行了概述。该问题的解决方案是基于在项目之间重新分配预先确定的项目总预算,以使项目的汇总质量最大化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号