The Construction Schedule Log: Charting the Project Path

机译:施工进度日志:绘制项目路径图

获取原文

摘要

Over the years, schedulers have focused attention on the individual project baseline andsuccessive updates for the purpose of planning, progress reporting and determination of timeextensions on construction projects. However, there is planning, organizational and analytical value inkeeping a detailed log of schedule updates produced during the course of a project. This includestrend analysis, overview of the project timeline, schedule update highlights and a quick reference forproject status. Like a ships log, the construction schedule log tracks the project’s path and can aid theproject team in charting the course to project completion. The schedule log also serves as a useful toolfor educating attorneys and consultants who may be called in to perform forensic analyses.Additionally, this paper introduces a dual-tracking schedule update method that uses the log as anessential analysis tool to isolate contractor schedule changes from activity performance achievedduring the update period.These and other related tools are recommended for organizational, decision-making and forensicanalysis by project cost engineers and schedulers.
机译:多年来,调度员将注意力集中在单个项目的基准和 为了计划,进度报告和确定时间而进行的连续更新 建设项目的扩展。但是,在以下方面具有计划,组织和分析价值 保留项目过程中产生的进度更新的详细日志。这包括 趋势分析,项目时间表概述,进度更新要点和快速参考 项目状态。就像船舶日志一样,施工进度日志可以跟踪项目的路径,并可以帮助 项目团队在规划课程到项目完成的过程中。计划日志也可以用作有用的工具 用于教育可能被要求进行法医分析的律师和顾问。 此外,本文介绍了一种双重跟踪计划更新方法,该方法将日志用作 必要的分析工具,可将承包商的进度变更与活动绩效隔离开 在更新期间。 建议将这些以及其他相关工具用于组织,决策和取证 由项目成本工程师和调度员进行分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号