The Construction Schedule Log:Charting the Project Path

机译:施工进度日志:绘制项目路径图

获取原文
获取原文并翻译 | 示例
           

摘要

Over the years, schedulers have focused attention on the individual project baseline and successive updates for the purpose of planning, progress reporting and determination of time extensions on construction projects. However, there is planning, organizational and analytical value in keeping a detailed log of schedule updates produced during the course of a project. This includes trend analysis, overview of the project timeline, schedule update highlights and a quick reference for project status. Like a ships log, the construction schedule log tracks the project's path and can aid the project team in charting the course to project completion. The schedule log also serves as a useful tool for educating attorneys and consultants who may be called in to perform forensic analyses. Additionally, this article introduces a dual-tracking schedule update method that uses the log as an essential analysis tool to isolate contractor schedule changes from activity performance achieved during the update period. These and other related tools are recommended for organizational, decision-making and forensic analysis by project cost engineers and schedulers. This article was first presented as PS.S05 at the 2010 AACE International Annual Meeting.
机译:多年来,调度员将注意力集中在单个项目的基线和后续更新上,以计划,进度报告和确定建筑项目的时间延长。但是,保留项目过程中产生的进度更新的详细日志具有计划,组织和分析价值。这包括趋势分析,项目时间表概述,进度更新要点以及项目状态的快速参考。就像船舶日志一样,施工进度日志可以跟踪项目的路径,并且可以帮助项目团队确定完成项目的过程。进度日志还可以作为有用的工具,用于教育可能需要进行法医分析的律师和顾问。此外,本文介绍了一种双跟踪进度表更新方法,该方法使用日志作为必要的分析工具,将承包商的进度表更改与更新期间实现的活动绩效隔离开来。这些和其他相关工具建议由项目成本工程师和调度员进行组织,决策和法医分析。本文最初在2010年AACE国际年会上作为PS.S05提出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号