首页> 外文会议>IEEE 10th International Computer-Aided Industrial Design Conceptual Design (CAID CD 2009) >Loading path design for tube hydroforming based on fuzzy logical control and CAE method
【24h】

Loading path design for tube hydroforming based on fuzzy logical control and CAE method

机译:基于模糊逻辑控制和CAE方法的管材液压成形加载路径设计

获取原文

摘要

In order to overcome the disadvantages of conventional optimization methods, a real-time feedback optimization method combined with fuzzy logical control and adaptive numerical simulation was proposed. Using fuzzy logical controller and defect control rules, development trend of forming defect was discovered and fed back to simulation software program in real time during the numerical simulation process, then the process parameters were adjusted to avoid occurrence of forming defect, the optimized forming loading path was obtained ultimately. Study results indicated that the hydroforming quality of T-shaped tube was improved under fuzzy logical control optimized loading path, fuzzy logical controlled optimization achieved prospective objective, and the optimization process can lead to better forming quality.
机译:为了克服传统优化方法的弊端,提出了一种结合模糊逻辑控制和自适应数值模拟的实时反馈优化方法。利用模糊逻辑控制器和缺陷控制规则,发现成形缺陷的发展趋势,并在数值模拟过程中实时反馈到仿真软件程序中,然后调整工艺参数以避免出现成形缺陷,优化了成形加载路径最终获得了。研究结果表明,在优化加载路径的基础上,改进了T形管的液压成形质量,达到了预期的目标,并且通过优化过程可以提高成形质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号