首页> 外文会议>International conference on transportation engineering;ICTE 2009 >CA MORTAR CONSTRUCTION OF THE TRIAL SECTION OF WUHAN-GUANGZHOU RAILWAY PASSENGER DEDICATED LINE
【24h】

CA MORTAR CONSTRUCTION OF THE TRIAL SECTION OF WUHAN-GUANGZHOU RAILWAY PASSENGER DEDICATED LINE

机译:武汉-广州客运专线试验段CA砂浆施工

获取原文

摘要

A five-step controlling method in the construction of cement-emulsified asphalt mortar (CA mortar) at Wuhan-Guangzhou Railway Passenger Dedicated Line (WGRPDL) is presented. The gathered data of the temperature, the construction rate, the fluidity and the air content of CA mortar are also analyzed. Results showed that the controlling method was effective in the construction management and the temperature had serious impact on the construction rate. Results also showed that the fluidity and air content of CA mortar almost had the same relative standard deviation; moreover, the two factors seemed to have linear relationships.
机译:提出了武广铁路客运专线水泥乳化沥青砂浆(CA砂浆)的五步控制方法。还分析了所收集的CA砂浆的温度,施工速率,流动性和空气含量的数据。结果表明,该控制方法在施工管理中是有效的,温度对施工速度有严重影响。结果还表明,CA砂浆的流动性和空气含量几乎具有相同的相对标准偏差。此外,这两个因素似乎具有线性关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号