THE COMPONENT TEST FACILITY - A NATIONAL USER FACILITY FOR TESTING OF HIGH TEMPERATURE GAS-COOLED REACTOR (HTGR) COMPONENTS AND SYSTEMS

机译:组件测试设施-用于测试高温气冷堆(HTGR)组件和系统的国家用户设施

获取原文

摘要

The Next Generation Nuclear Plant (NGNP) and other High-Temperature Gas-cooled Reactor (HTGR) Projects require research, development, design, construction, and operation of a nuclear plant intended for both high-efficiency electricity production and high-temperature industrial applications, including hydrogen production. During the life cycle stages of an HTGR, plant systems, structures and components (SSCs) will be developed to support this reactor technology. To mitigate technical, schedule, and project risk associated with development of these SSCs, a large-scale test facility is required to support design verification and qualification prior to operational implementation.As a full-scale helium test facility, the Component Test facility (CTF) will provide prototype testing and qualification of heat transfer system components (e.g., Intermediate Heat Exchanger, valves, hot gas ducts), reactor internals, and hydrogen generation processing. It will perform confirmation tests for large-scale effects, validate component performance requirements, perform transient effects tests, and provide production demonstration of hydrogen and other high-temperature applications.Sponsored wholly or in part by the U.S. Department of Energy, the CTF will support NGNP and will also act as a National User Facility to support worldwide development of High-Temperature Gas-cooled Reactor technologies.
机译:下一代核电站(NGNP)和其他高温气冷堆(HTGR)项目需要对旨在用于高效电力生产和高温工业应用的核电站进行研究,开发,设计,建造和运营,包括制氢。在高温气冷堆的生命周期阶段,将开发工厂系统,结构和组件(SSC)以支持该反应堆技术。为了减轻与这些SSC的开发相关的技术,进度和项目风险,需要大规模的测试设施来支持在操作实施之前进行设计验证和鉴定。 作为全面的氦气测试设施,组件测试设施(CTF)将提供原型测试和传热系统组件(例如,中间热交换器,阀门,热气导管),反应堆内部零件和制氢过程的鉴定。它将对大型效应进行确认测试,验证组件性能要求,执行瞬态效应测试,并提供氢气和其他高温应用的生产演示。 CTF由美国能源部全部或部分赞助,将支持NGNP,还将作为国家用户设施来支持高温气冷堆技术的全球发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号