THE PLANNING AND EXECUTION OF INTERNAL INSPECTIONS OF LARGE DIAMETER PCCP WATERLINES-A CASE STUDY

机译:大直径PCCP输水管道内部检查的计划和执行-案例研究

获取原文

摘要

The City of Phoenix is undertaking a comprehensive eight year program to inspect its entire 150-mile system of pre-stressed concrete cylinder pipe (PCCP) water transmission mains. This system serves over 1.4 million people over an area of more than 500 square miles. This paper illustrates in detail the numerous steps involved in planning and performing an internal inspection of a PCCP transmission main. A 40-year old, 4-mile long, 66-inch diameter pipeline is used as a case study. The specific steps and their related challenges include: Identification and development of individual inspection scenarios; risk assessment and the development of an inspection prioritization plan; the use of computerized hydraulic modeling to predict, mitigate, and address possible impacts of having portions of the system out of service; planning and coordination with planned shutdowns of pipelines and water production facilities related to concurrent capital improvement projects; development of detailed shutdown and startup plans providing step by step procedures for the isolation, dewatering, inspection, filling, and disinfection of the pipeline; intensive coordination efforts with City Engineering, Construction Management and Operations personnel; implementation of a valve management and exercise program well in advance of the shutdown of the pipeline; alternative methods for dewatering of the pipeline; the use of Job Order Contracting (JOC); identification and mitigation of field challenges; public involvement strategies; planning and execution of the actual electromagnetic and visual/sounding inspections; and lessons learned. The pipeline was placed back into service on the scheduled date and with no complaints from the public.
机译:凤凰城正在实施一项为期八年的综合计划,以检查其整个150英里长的预应力混凝土圆柱管(PCCP)输水主管系统。该系统为超过500平方英里的140万人提供服务。本文详细说明了规划和执行PCCP传输主管的内部检查所涉及的许多步骤。案例研究使用了一条已有40年历史,长4英里,直径66英寸的管道。具体步骤及其相关挑战包括:识别和制定单个检查方案;风险评估和检查优先级计划的制定;使用计算机化的液压模型来预测,缓解和解决使部分系统停止运行的可能影响;规划和协调与同时进行的资本改善项目相关的管道和水生产设施的计划停工;制定详细的停机和启动计划,提供逐步的程序,用于管道的隔离,脱水,检查,填充和消毒;与城市工程,施工管理和运营人员进行深入的协调工作;在关闭管道之前,应早执行阀门管理和执行程序;管道脱水的替代方法;使用工作订单合同(JOC);查明和缓解实地挑战;公众参与策略;计划和执行实际的电磁和视觉/声音检查;和经验教训。该管道已在计划的日期重新投入使用,没有任何公众投诉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号