A ROBUST OPTIMIZATION MODEL FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

机译:活动持续时间不确定的资源受限项目调度问题的鲁棒优化模型

获取原文

摘要

In researches of project scheduling, the majority is based on the hypothesis that the activity duration is deterministic. However, in the real world, a major challenge comes from the stochastic activity durations. In this paper, the current methods for the recourse-constraint project scheduling problem with uncertain activity durations are reviewed and their deficiencies are discussed. Then, combining with the robust optimization concept, a new robust optimization model is proposed for the recourseconstraint project scheduling problem, in order to reduce the turbulence caused by uncertain activity durations during the project implementation, and to improve the robustness of the project schedules. A case example is employed to illustrate the new robust model. An ant colony algorithm is integrated to solve the above mentioned problem and to generate a robust solution. The project schedule is also tested in various scenarios to analyze its robustness. The results are discussed in details to explore potential opportunities of further extensions and improvement of the proposed model.
机译:在项目进度研究中,大多数基于活动持续时间是确定性的假设。然而,在现实世界中,主要挑战来自随机活动的持续时间。本文综述了活动持续时间不确定的资源受限项目调度问题的当前方法,并讨论了它们的不足。然后,结合鲁棒性优化概念,针对资源约束项目调度问题提出了一种新的鲁棒性优化模型,以减少项目实施过程中活动时间不确定性造成的动荡,提高项目进度表的鲁棒性。以案例为例来说明新的鲁棒模型。集成了蚁群算法以解决上述问题并生成可靠的解决方案。项目进度表还在各种情况下进行了测试,以分析其稳健性。对结果进行了详细讨论,以探索进一步扩展和改进所提议模型的潜在机会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号