首页> 外文会议>2AESE 2007;International Conference on Advances in Experimental Structural Engineers >FULL-SCALE FATIGUE TESTS OF A CABLE-TO-ORTHOTROPIC BRIDGE DECK CONNECTION
【24h】

FULL-SCALE FATIGUE TESTS OF A CABLE-TO-ORTHOTROPIC BRIDGE DECK CONNECTION

机译:电缆到正交异性桥板连接的全尺寸疲劳测试

获取原文

摘要

Using a specially designed lever arm, full-scale fatigue tests of a cable-to-steel orthotropic bridge deck were conducted in the National Center for Research on Earthquake Engineering (NCREE). The prototype cable-stayed bridge is to be constructed in Sunchung, connecting Chong-shing Bridge and crossing Er-chong Flood Diverting Canal. The span of the cable-stayed bridge is 400-meter and the width of the orthotropic deck is 55.6-meter. A 7.5-meter long and 2.55-meter wide full-scale bridge deck was constructed in the steel fabricator's shop. The specimen was then shipped and anchored on the strong floor in NCREE's laboratory. Four actuators were mounted horizontally on the strong floor and connected to the top end of a steel lever arm. The lever arm was pin-anchored at the bottom end to the strong floor while attach its one quarter point to the rear end of the stay-cable anchor box. Two- million cycles of fatigue loads ranging between 391 to 689 tons (3836 to 6759kN) were applied at the rear end of the stay-cable anchor box. Tests results confirm that the full-scale welded cable-to- orthotropic bridge deck connection sustained two- million cycles of the stated loading without any sign of failure. Tests also confirm that following the fatigue tests, the stated connection sustained static loads, of 172, 345, 689 and 984 tons (1687, 3384, 6759 and 9653kN) lasting 5 minutes each, without any failure.
机译:在国家地震工程研究中心(NCREE)中,使用特殊设计的杠杆臂,对钢制正交异性桥面甲板进行了全面的疲劳测试。原型斜拉桥将在顺中兴建,连接崇圣大桥和跨二冲洪水引水渠。斜拉桥的跨度为400米,正交异性桥面的宽度为55.6米。在钢加工厂的车间里建造了一个7.5米长,2.55米宽的全尺寸桥面甲板。然后将标本运输并固定在NCREE实验室的坚固地板上。四个执行器水平安装在坚固的地板上,并连接到钢制杠杆臂的顶端。杠杆臂的底端用销钉固定在坚固的地板上,而四分之一的点固定在斜拉索锚固盒的后端。在拉索锚固盒的后端施加了200万次疲劳载荷循环,疲劳载荷范围为391至689吨(3836至6759kN)。测试结果证实,完整的电缆至正交异性桥面板的焊接在规定的载荷下承受了200万次循环,而没有任何失败的迹象。测试还确认,疲劳测试后,所述连接承受的172、345、689和984吨(1687、3384、6759和9653kN)的静载荷各持续5分钟,并且没有任何故障。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号