首页> 外文会议>Metropolitan Habitats and Infrastructure >New Technologies in China's First Jointless Integral-abutment Bridge
【24h】

New Technologies in China's First Jointless Integral-abutment Bridge

机译:中国第一座无接缝整体式桥台的新技术

获取原文

摘要

For small and medium bridges, the problems related to bridge deck joints can be overcome by the form of integral (or semi-integral) abutment bridge. But when adopting asphalt concrete pavement, the conventional integral bridge still has a joint between the approach slab and the approach pavement, which needs maintenance regularly and will eventually cause some local pavement failures and a bump. In order to solve mis problem, during the design of the first integral abutment bridge in China, Qingyuan Sijiu Bridge, some special treatments at the bridge approaches, such as the specially designed approach slabs and three-layers of geogrids on them, were applied. Therefore there is no expansion joint on the bridge deck and the approach pavement. The successful operation of the bridge in the past three years has proved that the techniques used in this project are effective. Theoretical analysis and experiments are also presented in this paper.
机译:对于中小型桥梁,可以通过整体(或半整体)桥台的形式克服与桥面节点有关的问题。但是,当采用沥青混凝土路面时,传统的整体式桥梁在进路平板和进路路面之间仍然有一个接头,需要定期维护,最终会导致局部路面故障和颠簸。为了解决问题,在设计中国第一座整体式桥台清远寺九桥的过程中,对桥进场进行了一些特殊处理,例如专门设计的进阶平板和三层土工格栅。因此,桥面和进近路面上没有伸缩缝。桥梁在过去三年中的成功运行证明了该项目中使用的技术是有效的。本文还进行了理论分析和实验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号