Writing More Competitive Proposals: Content Analysis of Selected (and Unselected) Construction Contractor Technical Proposals

机译:编写更多竞争的建议:所选(和未选择)建筑承包商技术提案的内容分析

获取原文

摘要

The public sector vertical construction market has historically procured contractors through price-driven methods. Yet the increased use of alternate project delivery methods along with owner-perceived concerns over construction performance has led many owners introduce qualifications-based selection criteria into their procurement systems. As a result, construction contractors are being tasked with preparation of technical proposals ever more frequently when pursuing public sector work. The research objective of this paper was to identify whether quantity and quality content elements of contractor technical proposal have a relationship with the owner evaluation committee's proposal evaluation scores. The methodological approach was to perform a content analysis on a sample of 50 contractor proposals (containing selected and unselected bids). Results indicate that certain quantity and quality elements do in fact have direct relationships with owner evaluation scores, and to varying degrees. The quantity of contractor-identified project risk solutions as well as proposal content that emphasized solutions to potential design errors and omissions, concealed existing conditions, and technical elements of the contractor's work plan, corresponded with higher evaluation scores. The quantity of proposed scope alternates also correlated with higher evaluation scores, along with scope alternates that were expected to have negligible impacts to project cost.
机译:公共部门的垂直建筑市场通过价格驱动方法历史上采购承包商。然而,使用备用项目交付方法的使用以及对施工绩效的所有者感知的担忧导致许多业主将基于资格的选择标准引入其采购系统。因此,在追求公共部门工作时,建设承包商正在任务编写技术提案。本文的研究目标是确定承包商技术提案的数量和质量内容是否与业主评估委员会的提案评估分数有关系。方法论方法是对50个承包商提案的样本进行内容分析(含有选定和未选择的出价)。结果表明,某些数量和质量要素实际上具有与所有者评估分数的直接关系,以及不同程度的关系。承包商确定的项目风险解决方案的数量以及强调解决潜在设计错误和遗漏,隐藏的现有条件和承包商工作计划的技术要素的提案内容,与较高的评估分数相对应。所提出的范围交替的数量也与更高的评估分数相关,以及预计对项目成本的影响可忽略不计的范围交替。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号