首页> 外文会议>Offshore technology conference;OTC 2000 >Global Analysis of the Terra Nova FPSO Turret Mooring System
【24h】

Global Analysis of the Terra Nova FPSO Turret Mooring System

机译:Terra Nova FPSO炮塔系泊系统的全局分析

获取原文

摘要

This paper describes the global mooring analysis conducted for the Terra Nova FPSO, located on the Grand Banks, offshore Eastern Newfoundland, Canada. The FPSO has a disconnectable internal turret mooring system that must withstand the 100-year storm environment, and be disconnectable to avoid collision with large icebergs. The global analysis of the FPSO vessel and mooring system focuses on the response of the system in storm conditions, and during offloading, disconnect and reconnect operations. The analysis was performed using sophisticated analytical and numerical techniques, integrated with a comprehensive model test program primarily for verification of the analysis. As the Terra Nova FPSO is the first such platform to operate in an iceberg region, a focus of the analysis was in studying the interaction of pack ice and icebergs with the FPSO system. The methodology used to analyze the FPSO system is outlined in this paper and some key results are presented.
机译:本文介绍了对Terra Nova FPSO进行的全球系泊分析,该系统位于加拿大纽芬兰东部近海的大银行。 FPSO具有可拆卸的内部转塔系泊系统,该系统必须承受100年的暴风雨环境,并且必须可拆卸以避免与大型冰山相撞。 FPSO船舶和系泊系统的全局分析着重于系统在暴风雨条件下以及在卸载,断开和重新连接操作期间的响应。分析使用复杂的分析和数值技术进行,并与主要用于分析验证的综合模型测试程序集成在一起。由于Terra Nova FPSO是第一个在冰山地区运行的平台,因此分析的重点是研究浮冰和冰山与FPSO系统的相互作用。本文概述了用于分析FPSO系统的方法,并提出了一些关键结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号