首页> 外文会议>International conference on coastal engineering;ICCE'98 >Breakwater Repair: Monitoring, Modelling, and Construction
【24h】

Breakwater Repair: Monitoring, Modelling, and Construction

机译:防波堤维修:监视,建模和构造

获取原文

摘要

The trunk section of the south breakwater, at the entrance to the prot of Richards Bay, has suffered some damage since its construction which was completed in 1976. This paper briefly discusses the changes in the design conditions as a result of sand-trap dredging off the breakwater, the annual photographic monitoring results showing the excessive rates of damage, and the model testing of various repair options, using 20t and 30t dolosse. Both 2D flume and 3D basin model tests were carried out at various scales, with fixed and movalbe bed models. Finally the construction of the optimal repair, carried out in 1997/98, using a heavy duty mobile crane (with 48m boom reach) and DGPS positioning, is described.
机译:自1976年竣工以来,位于理查兹湾保护区入口处的南防波堤主干段受到了一些破坏。本文简要讨论了由于沙坑疏off而导致的设计条件的变化。在防波堤上,每年的摄影监测结果显示出超高的损坏率,并使用20t和30t的dolosse进行了各种维修方案的模型测试。 2D水槽模型和3D盆地模型测试都是在固定和莫瓦贝河床模型的不同规模下进行的。最后,介绍了在1997/98年使用重型移动式起重机(吊臂行程达48m)和DGPS定位进行的最佳维修施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号