首页> 美国政府科技报告 >Repair, Evaluation, Maintenance, and Rehabilitation Research Program. Stability of Toe Berm Armor Stone and Toe Buttressing Stone on Rubble-Mound Breakwaters and Jetties. Physical Model Investigation.
【24h】

Repair, Evaluation, Maintenance, and Rehabilitation Research Program. Stability of Toe Berm Armor Stone and Toe Buttressing Stone on Rubble-Mound Breakwaters and Jetties. Physical Model Investigation.

机译:维修,评估,维护和康复研究计划。作者:郝建军,山西水利科技sHaNXI HYDROTECHNICs砾石防波堤和码头上的Toe Berm装甲石和脚趾支撑石的稳定性。物理模型调查。

获取原文

摘要

A series of two-dimensional (2-D) and three dimensional (3-D) breakwater stability experiments was developed and conducted to address the sizing of toe berm and toe buttressing stone in breaking wave environments. The 2-D tests focused on sizing of toe stone on rubble-mound structure trunks exposed to 90-deg wave attack, i.e. wave orthogonals perpendicular to structure crest. Toe berm armor stone sizing for oblique wave attack on rubble-mound structure heads and trunks was examined in the 3-D model tests. Guidance for sizing toe berm armor stone was developed for a range of wave and still-water level conditions. Guidance for sizing of toe buttressing stone was addressed for a limited set of incident wave conditions on structure trunks. Keywords: Breakwaters; Jetties; Rubble mound; Toe buttressing; Toe stability; Wave stability. (SDW)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号