Waste tires can be a significant threat to public health and the environment. Approximately 30 million passenger vehicle and off road vehicle tires are discarded, incinerated, crumped, or shipped out of state for reose or disposal each year. The Oxford Tire Piles in Westley, California is considered to be the largest tire pile in the state. Early estimates of the tire piles have ranged up to 40 million tires. Recent restiates by Califormia Integrated Waste Mangement Borard (CIWMB) staff placed the size of the tire ples at approximately 11 million tires as of May 1, 1997. In 1987ba tire-to-energy facility behan operating at the Oxford Tire Pirles. The facility was originally built to remediate by incineration the tires in the adjacent tire piles. Rhe site has also incinerated transient tires as well. This paper includes a discussion regarding the activities taken during the remediation by removal and incinerationof 42,000 tons (4.2 million) passenger tire equivalents from the Oxford Tire Piles under the modesto energy Limited partnership (MELP)/California Integrated Waste Mangement Board Tire Pile Remediation agreement. The amount of tires remaining on site is estimated to be approximately 6 million.
机译:废轮胎可能对公众健康和环境构成重大威胁。每年约有3000万辆乘用车和越野车轮胎被丢弃,焚化,压皱或运出州外进行配药或处理。加利福尼亚州韦斯特利的牛津轮胎桩被认为是该州最大的轮胎桩。轮胎堆的早期估计多达4000万个轮胎。 Califormia Integrated Waste Mangement Borard(CIWMB)员工最近进行的一次重新调整后,截至1997年5月1日,轮胎ples的尺寸约为1100万条轮胎。1987年,牛津轮胎皮尔斯的轮胎转能源设施投入运营。该设施最初旨在通过焚烧相邻轮胎堆中的轮胎进行修复。该地点还焚化了瞬态轮胎。本文讨论了根据Modesto能源有限合伙公司(MELP)/加利福尼亚综合废物管理委员会轮胎堆修复协议,从牛津轮胎堆中移除和焚化42,000吨(420万)客运轮胎当量的修复过程中所进行的活动。现场剩余的轮胎数量估计约为600万。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号