首页> 外文会议>Annual conference on explosives and blasting technique >Borehole Deviation Study in a Long-Hole Stope
【24h】

Borehole Deviation Study in a Long-Hole Stope

机译:长孔采场的钻孔偏差研究

获取原文

摘要

Does a 76 mm O hole drilled over 45 m deep remain straight? This is the question asked by the Engineering department at Placer Dome's Dome Mine in Timmins, Ontario before they could lay out the initiation sequence in a long-hole production stope. Everyone realized that the holes would wander over such great depths, but it was important to know where they went.
机译:在45 m深处钻出的76 mm O孔是否保持平直?这是位于安大略省Timmins的Placer Dome's Dome Mine的工程部门提出的问题,然后他们才能确定长孔采场中的起爆顺序。每个人都意识到这些洞会在如此深的深度上徘徊,但是了解它们的去向很重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号