Planning for faster drivage rate with roadheaders in Indian longwall mines: A field investigation

机译:计划在印度长壁煤矿使用掘进机提高掘进速度:现场调查

获取原文

摘要

Roadway drivages for timely preparation of longwall replacement panels matching massive production requirements, form the key to minimise the overall cost of longwalling. Keeping gate road development priorities and needs of longwall retreat mining in view, field investigations were carried out in Indian coalfields to ascertain the development rates achieved with existing roadway development systems(RDS) employing roadheaders as the cutting system and bridge and outbye conveyors as the transport system.This paper synthesizes the experience gathered while studying the roadheader performance in gate road development of Indian long walls to evolve a quantitative method, the Markov Modelling, for simulating and predicting roadway development system(RDS) performance under certainty and uncertainty to determine realistic time requirements for developing a panel of a given size under equipment and roof failures conditions. The machine utilisation and availability charts have been prepared and correlations between monthly progress and monthly-worked-hours have been developed for different roadheader models and mining methods were developed.The proposed mathematical model shows a promising application for planning and selecting suitable equipment configurations for achieving desired development rates. It has also identified the scope for improving development rates with existing infrastructure and with new infrastructure and equipment.
机译:及时准备符合大量生产要求的长壁更换面板的巷道驱动装置,是最大限度降低长壁总成本的关键。考虑到闸门公路发展的优先事项和长壁撤退采矿的需求,在印度煤田进行了实地调查,以确定使用掘进机作为切割系统并使用桥式和远距输送机作为运输工具的现有巷道开发系统(RDS)所实现的开发速度系统。 本文综合了在研究印度长墙闸道发展中的掘进机性能时收集的经验,以发展出一种定量方法,即马尔可夫模型,用于在确定性和不确定性下模拟和预测巷道开发系统(RDS)的性能,以确定实际的时间要求。在设备和屋顶故障情况下开发给定尺寸的面板。已准备了机器利用率和可用性图表,并针对不同的掘进机模型开发了每月进度和每月工作时间之间的相关性,并开发了采矿方法。 所提出的数学模型显示出一种有前途的应用,可用于计划和选择合适的设备配置以实现所需的开发速度。它还确定了利用现有基础设施以及新基础设施和设备提高发展速度的范围。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号