首页> 外文会议>Rapid excavation and tunneling conference >Construction of the inter-island tunnel boston harbor project
【24h】

Construction of the inter-island tunnel boston harbor project

机译:建设岛屿间隧道波士顿港口项目

获取原文

摘要

The Inter-Island Tunnel is a 7.7 kilometer (25, 160 foot) long by 3.5 meter (11.5 feet) diameter concrete lined tunnel through the Cambridge formation below Boston Harbor. Constructed as part of the Boston Harbor Project, this tunnel will bring untreated waste water from the MWRA's Rough System headworks facility at Nut Island in Quincy, MA to the new Deer Island treatment plant. A myriad of problems delayed the construction of the tunnel. These problems included slat water inflows of over 22,000 liters (5, 812 gallons) per minute, a major fire in the access shaft, weak rock and soil collapsing on the tunnel boring machine, and hand mining operations.
机译:岛间隧道是7.7公里(25,160英尺)的长3.5米(11.5英尺)直径的混凝土衬里隧道,通过波士顿港下面的剑桥形成。 作为波士顿港口项目的一部分,这条隧道将从MWRA的粗糙系统薪水设施的未经处理的废水带到Quincy的Nuciny,MA到新鹿岛治疗厂。 无数问题延误了隧道的建设。 这些问题包括平板水流量超过22,000升(5,812加仑)每分钟,在隧道镗床上折叠的进入轴,弱岩和土壤中的主要火力,以及手工挖掘操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号